Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

PRR Form.pdf

_______ COPIES $1.00 for the first page, $.05 each additional page (Where the total

Last Modified: 09/11/2024

Johnny Carson Park Shade Structure Public Artwork

exceeding $500,000 in construction costs are required to allocate 1% of the project’s total

Last Modified: 04/14/2025

20260421-ChandlerMetroFA2020-001.pdf

The total designated funds for design and construction of the Project is $3,299,105

Last Modified: 04/21/2026

Attachment 2 - 2311 N. Hollywood Way - Entitlements Resolution (DRAFT) V4 (FR and JHM Comments Incorporated).pdf

The density bonus increase and resulting number of proposed total units is consistent...level would significantly limit the ability of the Project to accommodate the...

Last Modified: 11/04/2021

Attachment 2 - 2311 N. Hollywood Way - Entitlements Resolution (DRAFT) V4.pdf

The density bonus increase and resulting number of proposed total units is consistent...level would significantly limit the ability of the Project to accommodate the...

Last Modified: 11/04/2021

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

The total RF is 3.0 (Total Reduction Factor, RF = RFt + RFv + RFs) making a design...Phosphorus Total Nitrogen ...

Last Modified: 06/26/2023

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

The total RF is 3.0 (Total Reduction Factor, RF = RFt + RFv + RFs) making a design...Phosphorus Total Nitrogen ...

Last Modified: 05/11/2023

Updated Project Plans

TOTAL ROOF DECK AREA= 4,741 S.F....TOTAL MEDICAL OFFICE SPACE AREA= 6,620 S.F....TOTAL COMMERCIAL FLOOR AREA= 67,748.6 S.F.

Last Modified: 09/25/2025

BFF-COU MOU (2021-22 to 2023-24)

The cumulative total hours will be reset at the beginning of each six-month period...Accumulation The total vacation accumulation shall be...

Last Modified: 03/02/2022

Attachment 2 – 2025-2029 Consolidated Plan

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 05/29/2025

Attachment 2 – Annual Action Plan

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 05/29/2025

Attachment 2 – 2025-2029 Consolidated Plan.pdf

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 06/02/2025

CON PLAN FINAL.pdf

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 06/18/2025

CON PLAN FINAL (1).pdf

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 07/17/2025

2025-2029 CON PLAN DRAFT.pdf

Renters Owner 0-30% AMI Owner >30-50% AMI Owner >50-80% AMI Total...) 31 (of the total) 11 (of the ...

Last Modified: 07/21/2025

1706 Magnolia Blvd_AUP_ Plans.pdf

NEW FLOOR PLAN A3.0 NEW EXTERIOR ELEVATION PLAN EQUIPMENT SPECIFICATION LIST TOTAL...AREA 89.5 SF (N) STORE 65"X78" FRONT WINDOW TOTAL AREA...

Last Modified: 07/29/2022

2022 TI Correction List

Total area of windows shall not exceed 25% of the area of common wall with any room...In occupancies with a total occupant load of 10 or less,...

Last Modified: 02/09/2026

Staff Report - Firearm Retailer Moratorium Extension - CC 8.23.22 (8.1.22) CM EDITS.pdf

extend the urgency ordinance for up to an additional 10 months and 15 days, for a total...Study the feasibility of limiting or reducing the total...

Last Modified: 09/06/2023

SR - Firearm Retailer Moratorium Extension - 07.18.23_V.6.29.23.pdf

hearing, Council can extend the Urgency Ordinance for one additional year, for a total...• Study the feasibility of limiting or reducing the total...

Last Modified: 09/06/2023

SR - Firearm Retailer Moratorium Extension - 07.18.23_V.6.29.23.pdf

hearing, Council can extend the Urgency Ordinance for one additional year, for a total...• Study the feasibility of limiting or reducing the total...

Last Modified: 07/06/2023

Staff Report - Firearm Retailer Moratorium Extension - CC 8.23.22 (8.1.22) CM EDITS.pdf

extend the urgency ordinance for up to an additional 10 months and 15 days, for a total...Study the feasibility of limiting or reducing the total...

Last Modified: 08/11/2022

6-8-21 PH - Attachment 4

(B) The analysis shall estimate the total cost of producing new rental housing that...ATTACHMENT 4-13 (B) The analysis shall estimate the total...

Last Modified: 05/27/2021

20210301__FinalAvionFEIR_Avion.pdf

A total of eighteen letters were received, containing a total of 136 written comments...The total development square...

Last Modified: 03/31/2021

Updated_Preliminary_Low_Impact_Development_Report.pdf

The total RF is 3.0 (Total Reduction Factor, RF = RFt + RFv + RFs) making a design...Phosphorus Total Nitrogen ...

Last Modified: 10/29/2024

Preliminary_Low_Impact_Development_Report

The total RF is 3.0 (Total Reduction Factor, RF = RFt + RFv + RFs) making a design...Phosphorus Total Nitrogen ...

Last Modified: 05/14/2024

Preliminary_LID_Report.pdf

The total RF is 3.0 (Total Reduction Factor, RF = RFt + RFv + RFs) making a design...Phosphorus Total Nitrogen ...

Last Modified: 01/11/2024

BPOA MOU (2021-2024) - Final 03.07.22 - Fully Executed.pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 06/02/2022

BPOA MOU (2021-2024).pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 03/08/2022

Burbank Red Tags Tin Horn Flats Building 3.31.21 Final .pdf

At this point the owner and their representatives have citations totaling $2,500

Last Modified: 04/14/2021

Attachment 1 - Resolution.pdf

The total number of written protests against the rate increases for water, refuse

Last Modified: 05/05/2022

FY 24-25 CDBG Final Statement.pdf

$212,916.00 Grand Total: $1,120,760.00 Date: 6/26/2024 Publish: 7/

Last Modified: 10/03/2024

5-18-21 PH - Attachment 1.pdf

The total number of written protests against the rate increases for water and refuse

Last Modified: 05/06/2021

Cover_Letter_From_Rand_Paster_Nelson_LLP.pdf

Attorney 1 Note that utilizing the maximum 50 percent density bonus would achieve a total

Last Modified: 01/11/2024

ADU APPLICATION

MECHANICAL ELECTRICAL PLUMBING Please Indicate the Total Quantity in the Space Provided

Last Modified: 02/09/2026

SITE IMPROVEMENT APPLICATION

POOL: YES NO MULTI-FAMILY POOL: YES NO PUBLIC POOL: YES NO GRADING / SHORING TOTAL

Last Modified: 02/11/2026

FY 24-25 CDBG Final Statement (1).pdf

$212,916.00 Grand Total: $1,120,760.00 Date: 6/26/2024 Publish: 7/3/2024

Last Modified: 04/15/2026

2022-2023 McKinley and Providencia Afterschool Daze Parent Handbook.pdf

City of Burbank Parks and Recreation Department does not distribute a cumulative total...You can view your ASD receipts and total amounts paid on...

Last Modified: 11/18/2022

Demolition of Residential Units Form_11082024

Are you proposing a reduction in the total number of units which currently exist...Non-housing Development Project Total Residential Units...

Last Modified: 11/12/2024

Attachment 5 - Planning Commission Minutes July 22, 2024

Planning Commission Resolution be revised to clarify that the project proposes a total...sectors with one antenna per sector, and each sector will have two radios with a...

Last Modified: 10/18/2024

DEMOLITION APPLICATION (July 2024) w Idemnification.pdf

Are you proposing a reduction in the total number of units which currently exist...Non-housing Development Project Total Residential Units...

Last Modified: 12/19/2024

Residential Parking Permit Program FAQs (24-25)_updated

I sold/ traded/ donated/ totaled my permitted vehicle....I sold/ traded/ donated/ totaled my permitted vehicle....If you...

Last Modified: 01/06/2025

2026 FEB FINALED

Final Date:Permit Status: NEW TWO-STORY ACCESSORY DWELLING UNIT STACKED DUPLEX TOTAL...interior demolition: (N) 977 GROSS SF 2nd floor addition: (N) 80 SF Porch: (N)...

Last Modified: 03/03/2026

BCEA MOU 2020 - 2022.pdf

Any full time employee who works the next shift by a total of hours that is one...The total employee contribution, including any cost sharing,...

Last Modified: 04/20/2021

BCEA MOU 2020 - 2022 (Final).pdf

Any full time employee who works the next shift by a total of hours that is one...The total employee contribution, including any cost sharing,...

Last Modified: 05/15/2023

2021_Pickwick_Arch_and_Site_Plan.pdf

TOTAL LIVING 1333 SQ. FT. PORCH NA DECK 68 SQ. FT. GARAGE 568 SQ. FT....TOTAL LIVING 1816 SQ. FT. GARAGE 447...

Last Modified: 11/23/2021

Draft Environmental Impact Report (DEIR) (LaTerra).pdf

Total parking would be 1,537 spaces....Health risks were quantified for each floor (seven and eight in total)....Total U.S.

Last Modified: 05/04/2021

SR - 921-1001 W. Riverside Dr V7.pdf

and/or upper-level decks for each unit (dwelling units are contained within a total...are arranged around a series of landscaped paseos and open spaces); • Of the...

Last Modified: 10/20/2022

2026 MAY FINALED

20 FT X 10FT MAX HEIGHT TENTS AND (8) 16 FT X16 FTX 10 FT MAX HEIGHT TENTS: (8) TOTAL...STORY GARAGE/STORAGE BUILDING WITH (N) 283 SF ADDITION TO CONVERT TO (N) 695 SF...

Last Modified: 06/15/2026

BCEA MOU 2024 - 2026 FINAL.pdf

Any full-time employee who works the next shift by a total of hours that is one...Up to 7.5% total 40....Effective December 1, 2024, the...

Last Modified: 06/24/2025

BCEA MOU 2024 - 2026 FINAL (1).pdf

Any full-time employee who works the next shift by a total of hours that is one...Up to 7.5% total 40....Effective December 1, 2024, the...

Last Modified: 06/24/2025

ripa board report 2025

• In 2023, POST closed a total of 5,194 cases....Figures 72 through 77 display the total number of complaints and the...

Last Modified: 08/19/2025

1130 W Olive Ave - Plans

TOTAL OFFICE SPACE= 2,722 S.F....TOTAL ROOF DECK AREA= 3,833 S.F....TOTAL BUILDING FLOOR AREA= 67,748.6 S.F.

Last Modified: 05/29/2024

California Community Economic Development Association Facilitates Over $6 Million in ADU Grants for Low Income Homeowners

The total amount of grant funding provided to these homeowners exceeds $6 million

Last Modified: 02/27/2023

Actress Elizabeth Stanton Teams Up with Buca di Beppo to Donate 5,000 Meals Los Angeles Area Programs

Combined, the agencies are to receive a total of 2,000 meals each.

Last Modified: 04/21/2021

SR - Public Health Goals_FINAL UPLOAD.pdf

Concentrations for gross alpha particle activity, uranium, gross beta particle activity, total

Last Modified: 08/11/2022

Final Statement FY 2025.pdf

$214,599.60 Grand Total: $1,072,998.00 Date: 6/11/2025 Publish: TBD

Last Modified: 04/15/2026

2019-08 Treasurer's Report.pdf

1.70 683 US Treasury | No Limit 16,000,000 16,087,820 15,949,542 3.74 2.01 748 Total...| Successor Agency LAIF | Housing Authority 16,837,000 500,000 ...

Last Modified: 03/09/2021

2019-11 Treasurer's Report.pdf

weighted average yield of the portfolio at the end of the month is 2.09% and the total...1.68 595 US Treasury | No Limit 16,000,000 16,051,210 15,951,933 3.56 1.93 657 ...

Last Modified: 03/09/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet