Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Harga Pasang Geomembrane PVC Wilayah Palopo Sulawesi Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Harga Pasang Geomembrane PVC Wilayah Palopo Sulawesi Selatan.
Search Results

Plans formal submittal #2_Part3 (1).pdf

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

20210507_630_Parish Pl_Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 05/07/2021

20210519_504_Hampton_Road.pdf

BY RIGID CONDUIT, INTERMEDIATE CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 05/18/2021

1. Police Commission_Redacted.pdf

TCP/IP, IPX, AppleTalk, Ethernet, FE, GE, IEEE 802.1Q, VRRP/HSRP, SIP, POS, ATM PVC

Last Modified: 06/15/2023

Attachment 1, Exhibit B - Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

UpperLARiver_Draft_Appendix7.pdf

maintenance (MH), including Shoring, per Plan $ 36,800.00 1 17 Install 12" ø PVC...than 0.5 in/hr and should meet the following criteria:  Minimum 4-inch slotted,...

Last Modified: 03/25/2021

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

UpperLARiver_Draft_Appendix5.pdf

Inlet Pipe Diameter/Type (i.e. 8” / PVC): ___________________________________...Inlet Pipe Invert Elevation if applicable: 13a Inlet Pipe DiameterType ie 8 ...

Last Modified: 03/25/2021

3411 Viewcrest Dr - Final Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/15/2023

2026 FEB ISSUED

$50,000.00Valuation: RE-ROOF GARAGE STRUCTURE (5000 SF): REMOVE (E) ROOF, INSTALL NEW 60 MIL PVC

Last Modified: 03/03/2026

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

3000 Haven Way, Burbank, CA 91504 - ARCH SET - UPDATED SET 1.9.25

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 01/28/2026

2025 NOV ISSUED

Commercial Repair and Maintenance $20,000.00Valuation: reroof - full tear off, install PVC

Last Modified: 12/01/2025

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

20210301_AppendixINoiseTechReport_Avion.pdf

35 35 35 1262 13 13 66.7 67.7 N San Fernando Blvd & Cohasset St Hard 40 35 35 35 1305

Last Modified: 03/31/2021

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 03/11/2026

20210401_3700RD_Appendix_E.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 04/12/2021

Appendix 11.1E_Phase I II ESA.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 11/29/2021

2025 AUG ISSUED

INSTALL NEW SARNAFIL PVC SINGLE PLY ROOF 1000 SF Commercial Roofing Systems, Inc

Last Modified: 09/02/2025

Attachment 6 - City Comments

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Attachment 6 - City Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/21/2024

1048 Sherlock Dr - (4-16-25)

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/23/2025

2026 APR ISSUED

and Maintenance $26,701.71Valuation: NONRESIDENTIAL RE-ROOF; OVERLAY, DURO-LAST PVC

Last Modified: 05/28/2026

2026 MAY ISSUED

$77,000.00Valuation: REROOF - AT LOW SLOPE ROOF AREAS, INSTALL NEW SARNARIL 72 MIL THICK PVC

Last Modified: 06/15/2026

20140101_2014_2021_Housing_Element.pdf

 Ave 1926 Two Units/4 Stories Or Less Or Less 2 6,970    0.16 101 2446‐031‐017 1305...1310 N Kenwood St 1946 Single Family Residence 1 6,098    0.14 121 2476‐001‐013...

Last Modified: 03/24/2021

20140101_2014_2021_Housing_Element (1).pdf

 Ave 1926 Two Units/4 Stories Or Less Or Less 2 6,970    0.16 101 2446‐031‐017 1305...1310 N Kenwood St 1946 Single Family Residence 1 6,098    0.14 121 2476‐001‐013...

Last Modified: 03/24/2021

Treasurer's Report November 2018.pdf

CC 12/27/2017 3,000,000.00 2.440 06/27/2022 3,000,000.00 1643 3,000,000.00 2.440 1305

Last Modified: 03/09/2021

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 02/16/2024

Attachment 4..pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/27/2022

2814 Empire Plans.pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/13/2022

Attachment 4 (3).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

Attachment 4 (4).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

1310 E Tujunga Ave - PLANS

conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 04/03/2026

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 12/26/2023

526 S. SUNSET CYN DR - Project Plans - 09-29-23

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 01/23/2024

DEIR Appendix F (LaTerra).pdf

SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET (1 CU. FT./FT.)

Last Modified: 05/04/2021

20210107-2012-Series-A-BWP-Revenue-Refunding-Bonds.pdf

2400 2400] /PageSize [612.000 792.000] >> setpagedevice 2012-05-03T22:27:20-0400

Last Modified: 01/07/2021

ApxK_Transportation Study.pdf

0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...

Last Modified: 07/09/2021

Attachment 1 - Resolution - ALL EXHIBITS

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/21/2024

2026.06.22 Def-Resp. City of Burbank -Cross-Complaint w exhs.

Andrews Catholic Church (311 North Raymond Avenue) • Holliston Community Church (1305...Pasadena 3 72.2 Holliston United Methodist Church 1305...

Last Modified: 06/26/2026

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

aggregate would be comprised of recycled concrete material and the proposed use of PVC...BMC Section 10-1-1305 adopts the FAA Filing Requirement...

Last Modified: 12/13/2024

ApxA1_AQandGHGTechnicalReport.pdf

micrometers or less ppb Parts per billion ppm Parts per million PV Photovoltaic PVC...Vinyl chloride is used in the process of making polyvinyl chloride...

Last Modified: 07/09/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...

Last Modified: 09/10/2021

2021_Planning_2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...

Last Modified: 09/14/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...

Last Modified: 09/10/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet