Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan.
Search Results

Guide to Burbank.pdf

Glenoaks Boulevard had been paved in 1910 when a campaign was started to bring the...Accounts Payable The Accounts Payable Section ensures all...

Last Modified: 01/03/2025

Guide to Burbank 2026 - May 2026

Glenoaks Boulevard had been paved in 1910 when a campaign was started to bring the...Accounts Payable The Accounts Payable Section ensures all...

Last Modified: 05/07/2026

1. Burbank Water and Power Board_Redacted

reception and visitor services, business continuity, enterprise security solutions, vendor...·Manage an annual $3.5M food and beverage budget and oversee two different...

Last Modified: 06/13/2024

4. Board of Library Trustees_Redacted

Angeles, CA Special Event Assistant, March 2016 – August 2016 • Coordination of vendor...• Monitoring of volunteers and vendors to ensure...

Last Modified: 06/24/2026

4 (1). board of library trustees_redacted

Angeles, CA Special Event Assistant, March 2016 – August 2016 • Coordination of vendor...• Monitoring of volunteers and vendors to ensure...

Last Modified: 06/24/2026

Fire Hazard Reduction Program - FAQs

Last Modified: 03/19/2026

20220808-Single-Audit-Report-June-30-2021.pdf

, we noted the City did not have adequate internal controls designed to ensure vendors

Last Modified: 08/09/2022

20260422-2025 DIF Report for Website-001 (1).pdf

The storage period cannot be expanded as the vendor's (Pelco) storage is proprietary

Last Modified: 04/22/2026

Code of Conduct 1.23.25

about the City, its employees, constituents, other public officials, suppliers, vendors

Last Modified: 05/07/2026

2. Park, Recreation and Community Services Board_Redacted.pdf

• Develop and manage vendor and subcontractor relationships - specifically in the...support organizations to resolve financial issues, interfaced with subcontractors,...

Last Modified: 06/15/2023

3001 EXHIBITS SB35-ATTACHMENT B.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be

Last Modified: 06/26/2023

3000 EXHIBITS SB35-ATTACHMENT B.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be

Last Modified: 06/29/2023

1115 East Elmwood Avenue - Decision Letter.pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 11/04/2022

1115 East Elmwood Avenue - Decision Letter (1).pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 11/04/2022

20210401_3700RD_Appendix_F.pdf

grading, on-site roads, differences in elevation and other implied boundaries such as paved

Last Modified: 04/12/2021

Updated_Preliminary_Hydrology_Report.pdf

California KHR Associates 5 Runoff flows westward into Mariposa Street, which is paved

Last Modified: 10/29/2024

Updated_Preliminary_Hydrology_Report (1).pdf

California KHR Associates 5 Runoff flows westward into Mariposa Street, which is paved

Last Modified: 10/29/2024

Preliminary_Hydrology_Report_second page

California KHR Associates 5 Runoff flows westward into Mariposa Street, which is paved

Last Modified: 05/14/2024

Appendix 11.1F_Hydrology Report.pdf

grading, on-site roads, differences in elevation and other implied boundaries such as paved

Last Modified: 11/29/2021

2607 W Magnolia Blvd - AUP - Decision Letter

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 02/15/2024

Preliminary_Hydrology_Report.pdf

California KHR Associates 5 Runoff flows westward into Mariposa Street, which is paved

Last Modified: 01/11/2024

20240502-FY-2024-25-Proposed-Budget-COMPLETE

Residential Pavement Rehabilitation Project to complete the concrete work prior to paving...Residential Pavement Rehabilitation Project to complete the concrete work prior...

Last Modified: 05/02/2024

9.20.2023_3000 W Empire Ave_Status_Letter and Attachments.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...Standards (Section 10-1-1417) All off-street parking areas shall be graded, ...

Last Modified: 10/02/2023

Appendix D - Historic Resource Assessment.pdf

landscaped front yard and a concrete driveway on the south side that leads to a paved...hedges in the front yard and a concrete driveway on the north side leads to a ...

Last Modified: 01/07/2025

Attachment 2.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 05/02/2023

Unrepresented Mid-Management Employees.pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 01/20/2021

CCW

Read how to file for a CCW with the Burbank Police Department.

Last Modified: 10/13/2025

6. Burbank Cultural Arts Commission_Redacted.pdf

• Develop and manage vendor and subcontractor relationships - specifically in the...support organizations to resolve financial issues, interfaced with subcontractors,...

Last Modified: 06/15/2023

20210204-Bicycle-Master-Plan-001.pdf

BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...

Last Modified: 02/05/2021

Attachment 1.pdf

Additional impacts to street triggered by this project could extend the paving...All off-street parking areas and accessways shall be graded,...

Last Modified: 10/27/2022

20201217-Bicycle-Master-Plan-001.pdf

BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...

Last Modified: 12/17/2020

ApxA2_ConstructionHealthRiskAssessment.pdf

2023 8 122 0 122 0 Building Construction 2024 1/1/2024 12/31/2024 8 366 0 273 93 Paving...05 0 Building Construction 2024 0 0.11167949 0.0059963 0 0.00012285 6.59589E-06...

Last Modified: 07/09/2021

20210401_3700RD_Initial_Study_Review_Draft.pdf

As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...

Last Modified: 04/12/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...

Last Modified: 11/29/2021

3001 SB35 - Plans.pdf

All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...

Last Modified: 06/26/2023

20210519_504_Hampton_Road.pdf

LANDSCAPE DETAILS AND SPECIFICATIONS PROPOSED COVERED PATIO PERMEABLE STONE PAVING...BELLOW THE STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 4" ABOVE EARTH OR 2" ABOVE...

Last Modified: 05/18/2021

WMR 7.5.24.pdf

eTRM) • Lighting calculations (wattage savings x operating hours) • Engineered vendor...December 28, 2023, the long-duration battery for the eco-campus was delivered by ...

Last Modified: 07/05/2024

7. Infrastructure Oversight Board_Redacted.pdf

philanthropic teaming agreements, corporate infrastructure contracts, consulting/vendor...Negotiated with vendors to achieve lower costs of...

Last Modified: 06/15/2023

FY 2025-26 Adopted Budget_Complete

300,000 300,000 300,000 1,800,000 3,300,000 Paving...their vendor record....a development standstill for the next two...

Last Modified: 09/11/2025

Complaint - Conformed.pdf

A beer vendor was also observed entering and exiting the patio with metal beer

Last Modified: 04/14/2021

Complaint - Conformed (1).pdf

A beer vendor was also observed entering and exiting the patio with metal beer

Last Modified: 04/14/2021

2025 Residential Correction List (1)

(CRC R401.3 exception, CBC 1804.4) Grading and Paving: Plans shall indicate how...(CRC R106.2, CBC 107.2.6) All existing and new driveways, driveway curb cuts,...

Last Modified: 06/24/2026

Attachment E - City Department Comments.pdf

There is no paved parking on site....HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

Attachment E - City Department Comments.pdf 1

There is no paved parking on site....HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 06/26/2023

9. Landlord-Tenant Commission_Redacted

Worker Academy; liaise with other Child Abuse and Law Enforcement agencies and vendors...Recognized as SUPERVALU’s Vendor of the Year in...

Last Modified: 06/13/2024

20201210.AdoptedBudget20_21.pdf

Wayfair decision imposed a collection requirement on out-of-state vendors....Increased the number of vendors and other payees receiving payment by...

Last Modified: 12/10/2020

3000 SB35 - Plans.pdf

All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...

Last Modified: 06/29/2023

Exhibit A 3000 Empire Plan 122822.pdf

All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...

Last Modified: 05/02/2023

Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

City requires list of identified vendors....4 HTong Response code 6: Sales are available online and at certain select vendors...Metro will...

Last Modified: 07/20/2026

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

Enhanced paving at main project entry.... West: 1300 Morningside & 1305 W.... West: 1300 Morningside & 1305 W.

Last Modified: 12/26/2023

6. Sustainable_Redacted

improvement to production • Supervise and train teams of up to 14 staff • Research vendors...and have completed training in nonprofit operations, fundraising, and...

Last Modified: 06/12/2025

20230504-FY-2023-24-Proposed-Budget-Final.pdf

26,752 The responsibilities of this position include management of annual paving...Residential Pavement Rehabilitation Project to complete the concrete work prior to...

Last Modified: 05/04/2023

20210401_3700RD_Appendix_B.pdf

The entire project site is paved with ornamental landscaping along the perimeter...The entirety of the project site is paved except for...

Last Modified: 04/12/2021

Resolution_No._22-29291.pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 02/07/2022

CDBG RFP FY 2026-27 FINAL w SAM Info Guide.pdf

Note: If you are a domestic vendor and need assistance with acquiring a federal contract

Last Modified: 12/29/2025

Library: The Golden Screen - The Movies that Made Asian America

takes an in-depth look at these cinematic triumphs, and the decades of films that paved

Last Modified: 10/14/2023

Revised 3000 Empire Drainage and Hydrology Study.pdf

GRADED BASIN OR PAVING (BY OTHERS). 7.

Last Modified: 07/11/2023

Attachment 8. FY 2022-23 Budget Public Hearing 5.24.22.pdf

Blvd Reconfig (Phase 1) CD 187,000 358,000 545,000 24184 FY 21-22 Annual Res Paving

Last Modified: 05/12/2022

2021_Planning_816 N Avon St Decision Letter (Signed).pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 07/20/2021

5-25-21 PH - Attachment 8 - FY 21-22 _CIP_Public Hearing 5.28.2021.pdf

32,794 23008 Downtown Ped Improvements CD 117,206 117,206 24184 FY 21-22 Annual Res Paving

Last Modified: 05/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet