Showing results for "dWA 0821 1305 0400 [[Adefa]] Biaya Pengadaan Geocomposite Landfill Terdekat Sleman DI Yogyakarta"
may require additional delineation of impacts; additional analytical testing per landfill...may require additional delineation of impacts; additional analytical testing...
Last Modified: 09/16/2022
The City of Burbank owns and operates Burbank Water and Power, the City’s Landfill..., such as the presence of a landfill gas capture system and...
Last Modified: 01/07/2025
: A MIN 65% OF GENERATED DEBRIS SHALL BE RECYCLED, REUSED, OR DIVERTED FROM THE LANDFILL
Last Modified: 08/26/2021
Last Modified: 04/27/2026
DI F L ega l Co nt ext This Report is designed to provide the necessary technical
Last Modified: 05/26/2022
Last Modified: 04/23/2026
11 Description Amount (H) Private Hauler Contractor License Fee $88.15 (I) Landfill...Outside public dumping not allowed to City's landfill. ...
Last Modified: 06/20/2022
HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through
Last Modified: 11/21/2024
Last Modified: 11/19/2024
1713 Standard Ave UNIVERSAL NAVA ELECTRIC 8185909667 91205CAGLENDALE Contractor 1305
Last Modified: 11/02/2026
trucks and large construction equipment while working in the Fleet Shop or the Landfill...Caterpillar Scraper Replace 500,000 500,000 - 498 The scraper at the...
Last Modified: 05/04/2023
& ESPALIERS Bougainvillea 'Monka' Bougainvillea Pandorea jasminoides 'Lady Di
Last Modified: 10/29/2024
Last Modified: 10/20/2022
program and to instead pay the Transportation Improvement Fee (the "Fee 11 ) , per Di
Last Modified: 01/18/2024
ASPHALT CONCRETE AP = ANGLE POINT CNC = CONCRETE CLK = CHAIN-LINK COR = CORNER DI
Last Modified: 01/31/2022
projects that generate potentially significant levels of air pollutants, such as landfill...projects that generate potentially significant levels of air pollutants, such...
Last Modified: 03/31/2021
The byproduct of the ZLD process is a salt cake that is dried and trucked to a landfill...This expansion was completed in 1997 and recycled water was used at the Burbank...
Last Modified: 06/10/2021
Ave 1926 Two Units/4 Stories Or Less Or Less 2 6,970 0.16 101 2446‐031‐017 1305...1310 N Kenwood St 1946 Single Family Residence 1 6,098 0.14 121 2476‐001‐013...
Last Modified: 03/24/2021
TAVITIAN 818-312--0 91367CAWOODLAND HILLS Contractor 5942 LUBAO AVENUE Fernando Di
Last Modified: 12/01/2025
Compensation for Accrued Sick Leave If an employee with unused sick leave credit dies
Last Modified: 01/20/2021
may require additional delineation of impacts; additional analytical testing per landfill...may require additional delineation of impacts; additional analytical testing ...
Last Modified: 10/29/2026
committed to 100% clean electricity and diverting 90% of its solid waste from landfills
Last Modified: 08/06/2026
HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through...& ESPALIERS Bougainvillea 'Monka' Bougainvillea Pandorea jasminoides 'Lady...
Last Modified: 03/08/2022
Last Modified: 12/02/2024
Last Modified: 06/02/2022
\ i f / : AM Y iit i i TH Dis } HH) U i ; = ; MN
been subdivided over the years and only the house and barn remained when Jeffries died
Last Modified: 04/12/2021
t..les of la an et 1cs ro 1bit m mb rs ro icip tin i o i o a a 1e a direc or i di
Last Modified: 10/20/2026
There is no need to pothole the existing 12" DI waterline that connects to the...JB 136 Smiranda Burbank - BWP Water 10/16/2025 Plans 15 Utilities Plans 8"...
Last Modified: 07/20/2026
LF records typically contain an inve ntory of solid waste disposal facilities or landfills...database provides a list of landfills derived from...
Contractor License Fee $91.67 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill.
Contractor License Fee $86.42 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's...
Contractor License Fee $86.42 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill.
Last Modified: 03/09/2023
, food-processing plants, chemical plants, composting operations, refineries, landfills...Therefore, when a City parkway tree dies it will be...
Last Modified: 05/31/2024
There is no need to pothole the existing 12" DI waterline that connects to the...JB 142 Smiranda Burbank - BWP Water 10/16/2025 Plans 16 Utilities Plans 12"...
Last Modified: 07/17/2026
IS NO OBSERVABLE EVIDENCE OF SITE USE AS A SOLID WASTE DUMP, SUMP, OR SANITARY LANDFILL
Last Modified: 10/13/2022
Last Modified: 10/27/2022
Last Modified: 11/29/2021
AN 77 SNMiranda Burbank - BWP Water 2/17/2026 Plans 18 Utilities Plans 8" DI
Last Modified: 06/22/2026
projects that generate potentially significant levels of air pollutants, such as landfill...Lane Configurations Traffic Volume (veh/h) 196 548 27 129 508 50 66 841 95 176...
Last Modified: 11/05/2026
Contractor License Fee $88.15 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill....
hauler's gross revenues Quarterly (K) AB 939 Late Fees $20.00 Per Business Day (L) Landfill...Outside public dumping is not allowed at the City's...
Last Modified: 12/12/2024
gross revenues Quarterly (L) AB 939 Late Fees $21.60 Per Business Day (M) Landfill...Outside public dumping is not allowed at the City's landfill.
Last Modified: 05/01/2025
Contractor License Fee $97.17 Per Each Vehicle Used in the Business/Annual (J) Landfill...Outside public dumping is not allowed at City's...
Last Modified: 09/20/2023
Last Modified: 08/07/2025
Last Modified: 12/12/2025
Last Modified: 09/04/2025
Last Modified: 09/05/2025
Showing 1,021 to 1,080 of 1,162 entries.