Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Harga Pasang Bentonite Liner Landak Kalimantan Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Harga Pasang Bentonite Liner Landak Kalimantan Barat.
Search Results

UpperLARiver_Draft_Appendix4a.pdf

GABRIEL CITY C5 34.0841 ‐118.105 San Gabriel 5360012901 0.98 13.19 SAN GABRIEL CITY 1305...o Bioretention areas should be lined on the sides with a 30 mil...

Last Modified: 03/25/2021

Appendix H - Hydrology Study.pdf

A 1-foot thick, hydrated bentonite seal was placed over the sand and drill cuttings

Last Modified: 01/07/2025

2025 FEB ISSUED

Contractor 6650 AMIGO AVENUE Issued Date:Permit Number:Permit Type: BS2501768 1305...2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2501892 ...

Last Modified: 03/10/2025

20220901-FY-2022-23-Adopted-CIP

projects include the Landfill Gas Well expansion, Phases IID/E of the landfill Liner...Point Landfill C1 Landfill C2 Landfill Gas Well Expansion Landfill Phase IID/E...

Last Modified: 09/01/2022

20201210.AdoptedCIP20_21.pdf

Capital projects for FY 2020-21 include liner construction and gas well expansion...projects include the Landfill Gas Well Expansion, Phases IID/E of the landfill...

Last Modified: 12/10/2020

20201210.AdoptedCIP19_20.pdf

Capital projects for FY 2019-20 include liner construction and gas well expansion...Due to operating efficiencies, the need for the new liner had...

Last Modified: 12/10/2020

20211202-FY-2021-22-ADOPTED-CIP.pdf

Capital projects for FY 2021-22 include liner construction and gas well expansion...Due to operating efficiencies, the need for the new liner had...

Last Modified: 12/02/2021

PWGreenStreetPolicy.pdf

They are contained within an impermeable liner and use an underdrain to direct treated

Last Modified: 03/25/2021

Green-Streets-Policy.pdf

They are contained within an impermeable liner and use an underdrain to direct treated

Last Modified: 04/13/2026

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

Continuing projects include the Landfill IID/E Liner Construction and Recycle Center...Operating efficiencies have allowed for postponing the installation of the new...

Last Modified: 09/11/2023

Appendix G - Geotechnical Report.pdf

A 1-foot thick, hydrated bentonite seal was placed over the sand and drill cuttings

Last Modified: 01/07/2025

Consistency Matrix - SB35 NOI - 910 S Mariposa

Requirement Map, which AIRPORT requires FAA Notice for all structures with height at 10-1-1305

Last Modified: 03/19/2024

2nd Submittal SB35 - 910 S Mariposa - Consistency matrix.pdf

requires FAA Notice for all structures with height at limits allowed by code. 10-1-1305

Last Modified: 07/06/2023

Planning Comments - Final Objective Standard Review

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The

Last Modified: 05/06/2024

Updated_Objective_Standards_Consistency_Matrix.pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 05/14/2024

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 07/25/2023

20210301_AppendixEGeotechInvestigat_Avion.pdf

LaboratoryDepth Lith- (feet) ology Material Description GJ a>i fO 3 CQ O c > o g 0) 3 <DWa

Last Modified: 03/31/2021

Attachment C - Objective Standards Consistency Matrix.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 06/26/2023

Attachment C - Objective Standards Consistency Matrix.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 05/08/2023

Combined Attachments A-N.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 05/24/2023

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

 West: 1300 Morningside & 1305 W.... West: 1300 Morningside & 1305 W.

Last Modified: 12/26/2023

UpperLARiver_Draft_Appendix7.pdf

o Permeable pavement should be lined on all sides with a 30 mil liner to protect...In areas with porous, high-permeability soils (i.e., >0.3 in/hr), an impermeable...

Last Modified: 03/25/2021

ApxE_Updated Geotechnical Investigation.pdf

anticipated infiltration invert to collect samples, and then backfilled with bentonite

Last Modified: 07/09/2021

2025 APR ISSUED

2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2503953 1305...COOL ROOF COMP SHINGLES EDWIN & CYNTHIA RAMOS 8186359998 91506CABURBANK Owner...

Last Modified: 05/01/2025

Attachment E - City Department Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

Attachment E - City Department Comments.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 06/26/2023

2019 W Magnolia - Decision Letter - 260408

Heights Surrounding Bob Hope Airport 10-1-1305: FEDERAL AVIATION ADMINISTRATION

Last Modified: 04/08/2026

Consistency Matrix - SB 35 NOI

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Project Applicant's Submitted Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Appendix C_AQ_Energy_GHG Data.pdf

Construction: Off-Road Equipment Per AQ Questionnaire As a conservative estimate, liner...Construction: Off-Road Equipment Per AQ Questionnaire As a conservative estimate,...

Last Modified: 12/13/2024

PP 08-2022.pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (1).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (2).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

09-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 09/13/2024

07-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 07/24/2024

LA County Affordable Housing Resources.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 03/11/2025

09-2025 PROJECT PLACE.pdf

Los Angeles (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 10/06/2025

Attachment 1, Exhibit B - Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

DEIR Appendix G-3 (LaTerra).pdf

1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 1302 1303 1304 1305...1292 1293 1294 1295 1296 1297 1298 1299 1300 1301 1302 1303 1304 ...

Last Modified: 05/04/2021

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

2026 MAR ISSUED

20/2026 MAGNOLIA BLVD Plumbing $2,000.00Valuation: SEWER LINE CHANGEOUT - 20' LINER

Last Modified: 04/03/2026

20210301_AppendixINoiseTechReport_Avion.pdf

35 35 35 1262 13 13 66.7 67.7 N San Fernando Blvd & Cohasset St Hard 40 35 35 35 1305

Last Modified: 03/31/2021

Draft Environmental Impact Report (DEIR) (LaTerra).pdf

Utilization of a subslab liner aids in Executive Summary Draft Environmental...Utilization of a subslab liner aids in venting the sub-slab...

Last Modified: 05/04/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet