Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta.
Search Results

12092023-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling

Last Modified: 12/08/2023

Attachment 6 (Reduced Size) – Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program.pdf

but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling

Last Modified: 11/22/2023

20260505-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

limited to, marsh, ☐ ☐ ☐ ☒vernal pool, coastal, etc.) through direct removal, filling

Last Modified: 05/05/2026

20210301_AppendixJTrafficImpactStud_Avion.pdf

0 Lanes AM AM NOON NOON PM PM AM NOON PM AM NOON PM 709 0 1028 666 0 922 1305...ro ach Buena Vista St and Magnolia Blvd , Burbank PM Peak Hour 1167 870 0 ...

Last Modified: 03/31/2021

20220421-FY-2022-23-Proposed-Annual-Budget-Final.pdf

software robots to automate repetitive, routine work between multiple systems, filling...11.550 11.550 12.500 0.950 * The Communications Manager position was previously...

Last Modified: 04/21/2022

20201210.AdoptedBudget20_21.pdf

YEARS 11.850 11.850 11.550 -0.300 * The Communications Manager position is being filled...collaborate with the Burbank Police Department (BPD) with their recruitment...

Last Modified: 12/10/2020

20201210.AdoptedBudget18_19.pdf

consecutive on-time budgets, kept its spending in line with revenues, and fully filled...YEARS 11.740 11.740 11.800 0.060 * The Communications Manager position is being...

Last Modified: 12/10/2020

03202024-2023 Electric Revenue Bonds OS.pdf

fifteen (15) minutes per station, one (1) day per week (Saturday) and (ii) the filling...fifteen (15) minutes per station, one (1) day per week (Saturday) and (ii) the ...

Last Modified: 03/20/2024

FY 2024-25 Adopted CIP_Final

Natural light from surrounding windows and clerestories fills the two upper office...In order to continue fill sequencing and continue...

Last Modified: 09/05/2024

FEMA P-807-1 (2023)

2017, “Development of a unibody system to improve the seismic performance of lightweight

Last Modified: 04/09/2024

FY 2021-22 Proposed Budget.pdf

The air compressor systems are used to fill breathing air into the air tanks used...STAFF YEARS 11.850 11.550 11.550 * The Communications Manager position is being...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

The air compressor systems are used to fill breathing air into the air tanks used...STAFF YEARS 11.850 11.550 11.550 * The Communications Manager position is being...

Last Modified: 04/22/2021

ripa board report 2025

Vacancies are filled by appointment for the unexpired term of a person with the same...conducting sentinel event reviews “[d]evote time to building and reviewing a timeline...

Last Modified: 08/19/2025

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 03/09/2023

20200121-2012-Waste-Disposal-Revenue-Bonds.pdf

estimated cost of $21,157 (in thousands) as the remaining estimated capacity is filled...the remaining estimated cost of $21,157 as the remaining estimated capacity is...

Last Modified: 01/21/2021

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

In order to continue to fill sequencing and continue uninterrupted operations, construction...software robots to automate repetitive, routine work between multiple...

Last Modified: 09/11/2023

Burbank Aleppo Pine Tree Removal MND

but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling...but not limited to, marsh, vernal pool, coastal, etc.) through direct removal,...

Last Modified: 05/31/2024

20201221-AFR-Year-Ending-June-30-19.pdf

the remaining estimated cost of $24,115 as the remaining estimated capacity is filled

Last Modified: 04/12/2021

20201221-AFR-Year-Ending-June-30-18.pdf

the remaining estimated cost of $23,595 as the remaining estimated capacity is filled

Last Modified: 04/12/2021

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20211209-AFR-Year-Ending-June-30-21.pdf

the remaining estimated cost of $24,202 as the remaining estimated capacity is filled

Last Modified: 12/09/2021

20211209-AFR-Year-Ending-June-30-2021.pdf

the remaining estimated cost of $24,202 as the remaining estimated capacity is filled

Last Modified: 12/10/2021

20211229-FY-21-22-Fee-Schedule-Final.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 12/12/2024

PROPOSED FY 2025-26 FEE SCHEDULE

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 05/01/2025

2023092023-FY-23-24-Fee-Schedule-Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/20/2023

Adopted FY 2025-26 FEE SCHEDULE - Final

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 08/07/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 12/12/2025

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/04/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/05/2025

20250625 (3).fy25_26feescheduleadopted.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 12/18/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/17/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 03/18/2026

20230630-FY-23-24-Fee-Schedule-Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 07/10/2023

20220227-AFR-Year-Ending-June-30-22.pdf

the remaining estimated cost of $25,194 as the remaining estimated capacity is filled

Last Modified: 02/27/2023

FY 2024-25 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 06/27/2024

20231005-FY-23-24-Fee-Schedule_Final.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/01/2023

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

administration fee, plus the permit fee based on the total cubic yeards of both cut and fill

Last Modified: 06/20/2022

20260630-FY-26-27-Adopted-Fee-Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 06/29/2026

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 03/17/2026

20260814-FY-26-27-Adopted-Revised

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 09/22/2026

FY 2026-27 Adopted Fee Schedule REVISED 11.5.26

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 11/05/2026

20230504-FY-2023-24-Proposed-Budget-Final.pdf

11.550 12.500 13.000 0.500 * The Communications Manager position was previously filled...Conduct recruting to fill vacancies from retirements. 11...

Last Modified: 05/04/2023

Con Plan -IDIS FINAL (1).pdf

Entry-level roles are filled by workers with high school or associate degrees,

Last Modified: 04/15/2026

Con Plan -IDIS FINAL.pdf

Entry-level roles are filled by workers with high school or associate degrees,

Last Modified: 09/15/2025

2026.05.20-Summons & Complaint-001.pdf

Fill in aoolicable sections onlv 47....Fill in applicable sections onlv 47.

Last Modified: 06/01/2026

2026.05.20-LA Metro BRT Lawsuit COB-001.pdf

Fill in aoolicable sections onlv 47....Fill in applicable sections onlv 47.

Last Modified: 06/01/2026

50c. 2021 Water bonds OS.pdf

irrigation, power plant use, commercial uses, golf course irrigation, and water truck filling

Last Modified: 03/20/2024

03202024-2021 Water bonds OS.pdf

irrigation, power plant use, commercial uses, golf course irrigation, and water truck filling

Last Modified: 03/20/2024

20260601-2026.05.20 Summons & Complaint reduced-001.pdf

Fill in aoolicable sections onlv 4 7....Fill in applicable sections onlv 4 7.

Last Modified: 06/01/2026

Att3-Resolution Adopting the Media District Specific Plan Update

recreational opportunities through the dual use of existing facilities, such as land fill...COMPLETE OUR STREETS PLAN Goal 1: Complete networks for all modes of travel ...

Last Modified: 10/29/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet