Search Results

Showing results for "dWA 0821 1305 0400 Harga Jasa Hidroseeding Green Project Gunungkidul DI Yogyakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Jasa Hidroseeding Green Project Gunungkidul DI Yogyakarta.
Search Results

New Residential recycling

Last Modified: 11/11/2025

CityofBurbankPIOStrategy87.pdf

studio will enable staff to increase programming content with the ability to use a green...It is projected that due to decreasing PEG funding,...

Last Modified: 01/14/2021

Planning_2021_3700 Riverside Draft EIR.pdf

Region, Urban Greening....Region, Urban Greening....Region, Urban Greening.

Last Modified: 11/29/2021

Appendix A_NOP and Recirc NOP.pdf

PROJECT LOCATION AND SETTING PROJECT LOCATION The 2500 N....Sustainability Features The Project would be designed...

Last Modified: 12/13/2024

Women Painters West 2022

Last Modified: 07/28/2025

Draft EIR.pdf

Region, Urban Greening....Region, Urban Greening....Region, Urban Greening.

Last Modified: 03/24/2022

Community Meeting - 2230 N. Frederic Street

https://www.burbankca.gov/web/community-development/pendingprojects">Pending Projects

Last Modified: 03/04/2025

Community Meeting - 2021 N. Parish Pl.

https://www.burbankca.gov/web/community-development/pendingprojects">Pending Projects

Last Modified: 06/18/2025

20210101_Fiscal Year 2019-20 Draft Consolidated Plan Annual Performance Evaluation Report (CAPER).pdf

residential services on energy and water efficiency  Implement California Green...Business Improvement Districts (Property and Tourism)  Expand the growth of...

Last Modified: 05/20/2021

WMR 5.16.25.pdf

equity and inclusion in recruitment hiring and promotional processes Lieutenant Green

Last Modified: 05/16/2025

PHC-Permit-Application.pdf

Waste Collection C&D Waste Collection Source-separated recycling; organics (green

Last Modified: 04/14/2026

3411 Viewcrest Dr - Final Plans.pdf

534 SF APPLICABLE CODES: TITLE 9 CHAP. 1 BMC, 2019 CBC, CRC, CMC, CEC, CPC, CAL GREEN...A-9 - EXISTING ELEVATIONS A-3 - EXISTING ROOF PLAN A-11 - SECTIONS A-14 -...

Last Modified: 06/15/2023

Appendix A - Air Quality Technical Report.pdf

Green Building Council and the Business Council on Climate Change (BC3)....California Green Building Standards Code. Section 2....Therefore,...

Last Modified: 01/07/2025

CIP Updates Completed Projects

Date Construction Completion Date   Project Project Number Project Manager Scope...Project...

Last Modified: 03/03/2025

CIP Updates New Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

DRAFT Consolidated Plan 2025-2029.pdf

Programs that support energy-efficient home upgrades, weatherization, and green...Parks and Green Spaces Access to...

Last Modified: 05/09/2025

CIP Updates Continued Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

Burbank Economic Development Strategic Plan 2024-2028

such as the Batman statue, the recently added Wonder Woman statue, and upcoming Green...to grow and succeed in the areas of innovation in technology, healthcare, and ...

Last Modified: 05/21/2024

Att3 - Burbank 2024-2028 Economic Development Strategic Plan

such as the Batman statue, the recently added Wonder Woman statue, and upcoming Green...to grow and succeed in the areas of innovation in technology, healthcare, and ...

Last Modified: 11/26/2025

Eating Right Tips for Older Adults.pdf

Eat a variety of diferent colored vegetables, including ones that are dark-green,

Last Modified: 03/03/2025

Customer-List-Format (1).xlsx

Common values: Garbage, Recycling, Cardboard, Organics, Food Waste, Yard Waste, Green

Last Modified: 04/14/2026

Updated_Objective_Standards_Consistency_Matrix.pdf

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 10/29/2024

PBV Final Draft Burbank RFP_update 1.pdf

Page 9 of 44 DI....the project B....costs for this project.

Last Modified: 06/06/2024

ApxE_Updated Geotechnical Investigation.pdf

If the California Green Building Code requirements apply to this project, the vapor...As an alternative to the clean aggregate suggested in the...

Last Modified: 07/09/2021

2022_PLanning _ 830 E SanJose PLans Recommended Project Plans.pdf

20089A0.1 Cover sheet A0 plans 20089A0.2 Cover sheet A0 20089A2.1 Floor Plan A2 20089A2.2 Floor Plan A2 20089A2.3 Floor Plan A2 20089A3.1 Elevations A3 20089A3.2 Elevations A3 plans ...

Last Modified: 02/17/2022

3700 Riverside Final EIR.pdf

standards exceeding the current 2019 California Green Building Code to mitigate...At the time the Draft EIR was prepared (November 2021), the Burbank Bus...

Last Modified: 03/18/2022

Ordinance - Attachment 1 modified 2-12-24 CCO EDITS.pdf

If the animal in question dies or is sold, transferred, or permanently removed from

Last Modified: 02/15/2024

Attachment 2 - FOOD AND AGRICULTURAL CODE.pdf

If the dog in question dies, or is sold, transferred, or permanently removed from

Last Modified: 02/15/2024

20210101_Fiscal Year 2018-2019 Consolidated Plan Annual Performance Evaluation Report.pdf

residential services on energy and water efficiency  Implement California Green...Business Improvement Districts (Property and Tourism)  Expand the growth of...

Last Modified: 05/20/2021

2025-2029 CON PLAN DRAFT.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/21/2025

3700 RIverside - Final EIR Attachment 13.pdf

standards exceeding the current 2019 California Green Building Code to mitigate...At the time the Draft EIR was prepared (November 2021), the Burbank Bus...

Last Modified: 03/24/2022

Attachment 2 – 2025-2029 Consolidated Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – Annual Action Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – 2025-2029 Consolidated Plan.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/02/2025

CON PLAN FINAL.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/18/2025

CON PLAN FINAL (1).pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/17/2025

Original Application.pdf

Project No....Characteristics Your Proposed Project Surrounding Neighborhood Project size (land...A 91 50 2 10 0% ...

Last Modified: 11/24/2025

Economic Development Dept_2022-23_Annual_Report_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 10/16/2023

econdev_2022-23_annual_rpt_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 01/25/2024

Lockheed Soil Vapor Extraction Facility Scoping Meeting

meeting is being held to introduce the Lockheed Soil Vapor Extraction Facility project

Last Modified: 03/07/2025

840 E Verdugo - Plans

HEIGHT, WITH GREEN BOARD OR TWO LAYERS OF 15 LBS MOISTURE BARRIER W/ MTL....USE 5/8" GYPSUM GREEN BOARD IN @ WET (TUB/SHOWER, 3....USE 5/8" GYPSUM...

Last Modified: 08/18/2022

6-22-21 PH - ATTACHMENT 1

Green Street Project In 2010, BWP constructed a Green Street project on the Lake...The...

Last Modified: 06/10/2021

Leland Way Streetscape Project

Last Modified: 05/20/2026

Virtual Community Meeting: East Olive Avenue Paving Restriping

img alt="" src="/documents/20124/0/20231120-East+Olive+Avenue+Paving+Restriping+ Project ...The purpose of this restriping project is to enhance roadway safety for all...

Last Modified: 11/20/2023

In-person Community Meeting: East Olive Avenue Paving Restriping

img alt="" src="/documents/20124/0/20231120-East+Olive+Avenue+Paving+Restriping+ Project ...The purpose of this restriping project is to enhance roadway safety for all...

Last Modified: 11/20/2023

Con Plan -IDIS FINAL.pdf

The city enforces Low Impact Development and Green-streets policies....Investments in green infrastructure like rain gardens and permeable...

Last Modified: 09/15/2025

Con Plan -IDIS FINAL (1).pdf

The city enforces Low Impact Development and Green-streets policies....Investments in green infrastructure like rain gardens and permeable...

Last Modified: 04/15/2026

202101_Planning_HistoryofBurbankColoringBo.pdf

BO BS MAIL BURBANK CALIFORNIA CITY HALL DOWNTOWN ENVIRONMENT GREEN HISTORICAL

Last Modified: 06/02/2021

CIP Projects in Construction

Last Modified: 03/25/2026

20220915-Parking FAQ's (22-23) - final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 09/15/2022

20220811-Parking-FAQ's-(22-23)-final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 08/11/2022

20220815-Parking FAQ's (22-23) - final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 08/14/2022

20220915-Parking FAQs (22-23) - final-rev

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 07/01/2024

20210301_AppendixHHydrologyandWater_Avion.pdf

_______________ Owner is aware of the requirements of County of Los Angeles’ Green...Based on the dis- tance, direction, depth to groundwater,...

Last Modified: 03/31/2021

Caltrans Project Update

Caltrans project update Road Construction.png Burbank, CA (January 26,

Last Modified: 03/11/2021

Appendix G - Geotechnical Report.pdf

2.2 or 200-2.4 of the “Standard Specifications for Public Works Construction”, (Green...BORING 3 (PROJECTED) BORING 2...

Last Modified: 01/07/2025

Completed CIP Projects

Last Modified: 07/28/2025

Attachment 3 - Planning Commission Resolution No. 3472 dated July 22, 2024

Main Street, Burbank, CA 91506 (Project Site)...., and to consider and act on the underlying Project application....Electrical Code, California...

Last Modified: 10/18/2024

Historic Preservation Program

Last Modified: 09/17/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet