Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"
In addition, the project requests a 50% density bonus and the Project Applicant... Call the project planner, David Kim,...
Last Modified: 11/16/2023
Hollywood Way – Dual Brand Hotel Project (project)....Hollywood Way – Dual Brand Hotel Project...
Last Modified: 12/13/2024
(Project)....are adequately addressed through the standards themselves rather than through project-by-project...than for...
Last Modified: 06/03/2026
The Project includes a request for a 42.5% increase of the Project’s allowed base...Furthermore, the mixed-use development...
Last Modified: 11/04/2021
Project Title: Avion Burbank Project 2....The proposed project would also include Avion Burbank...
Last Modified: 03/31/2021
Call the project planner, Fatima Benitez, at 818-238-5250 E-mail the project... Call the project planner, Fatima...
Last Modified: 10/18/2024
Last Modified: 07/22/2024
BACKGROUND Project Description The Project site at 2814 W....The Project proposes demolition of all the existing...
Last Modified: 10/27/2022
Last Modified: 10/20/2022
BACKGROUND Project Site and Surrounding Context The 1.01-acre Project site is located...The Project proposes two...
Last Modified: 12/26/2023
BACKGROUND Project Site and Surrounding Context The 1.01-acre Project site is located...However, since this is a residential...
Last Modified: 11/19/2024
Last Modified: 11/21/2024
The Project site address is 4100-4108-4110 W.... Call the project planner, David Kim, at (818) 238-5250 E-mail the...
Last Modified: 04/12/2024
Public Notice Proposed Mixed Use Project to include 862 new units, up to 151,800... Call the project planner, Maciel Medina, at 818-238-5250 ...
Last Modified: 05/26/2021
Unlike a traditional transit project operating in Metro right of way, the project...project does not fall to the...
Last Modified: 05/28/2026
BACKGROUND Project Description The Project is to install a roof-mounted wireless...ATTACHMENT 4 - PAGE 2 Project...
Size 5 to 9 Units Ownership Projects $11.24 Per Square Foot Rental Projects $5.75...Projects $8.42 Per Square Foot 14+...
Last Modified: 06/20/2022
(“Project”) pursuant to SB 35....Project Description The Project site is located at 1001 W....The type of unit proposed...
Last Modified: 03/04/2022
located at 910 South Mariposa Street (Project)....The Project site is located within the 91506 zip code....The Project...
Last Modified: 01/17/2023
Last Modified: 06/23/2023
No. 21-0003268 (Conditional Use Permit, Development Review) Project Title...Project Applicant Greg Mirza-Avakyan, Associate Planner (818)...
Last Modified: 07/07/2022
Call the project planner, Greg Mirza-Avakyan, at 818-238-5250 E-mail the project... Call the project planner, Greg...
Last Modified: 12/14/2022
24 CFR Part 58 Project Information Project Name: The Village at Fairview...the Project....the...
Last Modified: 01/07/2025
Is the Project also an SB 35 application?...by the Project applicant....Project site?
Last Modified: 07/29/2024
The Amended Project application (Attachment 3-Amended Project Submittal) submitted...the perimeter of the Project site...
Reference: Highlight if Instructions Note that Section Will Apply 1 Is the project...a new construction requiring plan check or a public transit...
Last Modified: 09/22/2025
Public Notice Proposed 24-Unit Multi- Family Residential Project at 529-537 E.... Call the project planner, David Kim, at 818-238-5250 ...
The Project site is located within the Neighborhood Business (NB) zone.... Call the project planner, Fatima Benitez, at 818-238-5250 E-mail...
Project Description Rodrigo Escobar, LRA Architecture Project Applicant...The project qualifies for this...
Last Modified: 09/07/2021
The project also includes a proposed 97 total parking stalls.... Call the project planner, Xjvirr Thomas, at 818-238-5250 E-mail the...
Last Modified: 04/18/2024
The project will provide 6 parking spaces.... Call the Project Planner, Xjvirr Thomas, at 818-238-5250 E-mail the...
Last Modified: 02/11/2025
Last Modified: 01/13/2025
Olive Avenue (Proposed Project)....The Project site is currently vacant; therefore, the Proposed Project would not...The...
Last Modified: 05/24/2023
BACKGROUND Project Description The Project is to install a roof-mounted wireless...Project History A summary of the...
Summary of Project Modifications The Project has been modified since the Applicant...Project Description as Modified ...
Last Modified: 10/14/2022
Last Modified: 11/28/2023
BACKGROUND Project Description The Project site is one acre (43,560 square-feet...Submittal of a SB 35 Project...
Last Modified: 03/20/2023
Last Modified: 06/26/2023
the project B....costs for this project....Project Eligibility Threshold B. Ineligible...
Last Modified: 06/06/2024
Public Notice MSG Media Studios Project – Proposed 95-foot-tall spherical geodesic... Call the project planner, Greg Mirza-Avakyan, at...
Last Modified: 05/04/2021
Last Modified: 06/04/2024
The Project includes the construction of a one-story, 880 square feet Starbucks... Call the project planner, David Kim, at 818-238-5250 ...
Last Modified: 07/28/2021
the project B....Project Unit Numbers Size of Units in Project Square Footage...costs for this...
Public Notice Project No. 21-0006697, a Single-family Special Development Permit... Call the project planner, Joseph Pangilinan, at 818-238-5250...
Last Modified: 01/25/2023
TBD The Project complies with the dedication, as shown on the Project plans....TBD The Project complies with the...
You can call or write to provide input on the project....You can call or write to provide input on the project....For large...
Last Modified: 02/08/2022
The project had been previously approved for an HDP in 2022 (Project No. 20-0000266... Call the project planner, Joseph...
Last Modified: 01/23/2024
Last Modified: 06/18/2025
Last Modified: 09/18/2025
With the exceptions of those projects that are exempted (see below), applications...DO I NEED TO FILE AN APPLICATION FOR MY PROJECT?...DR IS...
Last Modified: 06/02/2021
Last Modified: 03/29/2021
Burbank 1 MITIGATION MONITORING AND REPORTING PROGRAM The following project...features (PDF’s) and environmental mitigation measures shall be incorporated...
Last Modified: 09/10/2021
Showing 1,081 to 1,140 of 3,444 entries.