Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Pemborong Plafon PVC Hitam Polos Murah Tanah Abang Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Pemborong Plafon PVC Hitam Polos Murah Tanah Abang Jakarta Pusat.
Search Results

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214 DWA

Last Modified: 07/25/2023

2026 FEB ISSUED

$50,000.00Valuation: RE-ROOF GARAGE STRUCTURE (5000 SF): REMOVE (E) ROOF, INSTALL NEW 60 MIL PVC

Last Modified: 03/03/2026

3411 Viewcrest Dr - Final Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/15/2023

3000 Haven Way, Burbank, CA 91504 - ARCH SET - UPDATED SET 1.9.25

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 01/28/2026

Combined Attachments A-N.pdf

######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214 DWA

Last Modified: 05/24/2023

2025 NOV ISSUED

Commercial Repair and Maintenance $20,000.00Valuation: reroof - full tear off, install PVC

Last Modified: 12/01/2025

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 03/11/2026

Appendix 11.1E_Phase I II ESA.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 11/29/2021

2025 AUG ISSUED

INSTALL NEW SARNAFIL PVC SINGLE PLY ROOF 1000 SF Commercial Roofing Systems, Inc

Last Modified: 09/02/2025

20210401_3700RD_Appendix_E.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 04/12/2021

2026.07.27 Pet. Metro's DeFrenza Declaration ISO Motion for Reconsideration

Burbank - BWP Electric 5/8/2026 Plans 198 Traffic Signal Plans INSTALL NEW 3-INCH PVC...PW Traffic 5/19/2026 Plans 31 Traffic Signal Plans Note 11 install new 3-inch...

Last Modified: 08/06/2026

1048 Sherlock Dr - (4-16-25)

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/23/2025

2026 APR ISSUED

and Maintenance $26,701.71Valuation: NONRESIDENTIAL RE-ROOF; OVERLAY, DURO-LAST PVC

Last Modified: 05/28/2026

2026 MAY ISSUED

$77,000.00Valuation: REROOF - AT LOW SLOPE ROOF AREAS, INSTALL NEW SARNARIL 72 MIL THICK PVC

Last Modified: 06/15/2026

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 02/16/2024

2025 FEB ISSUED

HOLLYWOOD WAY Plumbing $175,000.00Valuation: PIPE REPLACEMENT: 560 LF TRENCH (3) 2.5" PVC

Last Modified: 03/10/2025

1310 E Tujunga Ave - PLANS

conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 04/03/2026

2814 Empire Plans.pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/13/2022

Attachment 4 (3).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

Attachment 4 (4).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

Attachment 4..pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/27/2022

526 S. SUNSET CYN DR - Project Plans - 09-29-23

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 01/23/2024

20140101_2014_2021_Housing_Element.pdf

2621 N Glenoaks Blvd 1999 Single Family Residence 1 5,227    0.12 69 2472‐019‐020 2611

Last Modified: 03/24/2021

20140101_2014_2021_Housing_Element (1).pdf

2621 N Glenoaks Blvd 1999 Single Family Residence 1 5,227    0.12 69 2472‐019‐020 2611

Last Modified: 03/24/2021

2244 N. Buena Vista CEST and Appendices_06.16.2025_KH signed.pdf

Number: CC2596-1 August 29, 2023 C40 G&P Service Inc C41 Peterson Auto Care 2611...DATA MICROFILIMING CORP Cole Information 1992 DATA MICROFILMING Cole Information ...

Last Modified: 06/17/2025

6-22-21 PH - ATTACHMENT 1

I 2611 ~ i 27 : I 281, II I. II accumulate by In Lieu Storage....I " ': 22 ii 23 L 24 II il 251 2611 :, 27 " 2sl!

Last Modified: 06/10/2021

DEIR Appendix F (LaTerra).pdf

SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET (1 CU. FT./FT.)

Last Modified: 05/04/2021

20201216.AdoptedBudget17_18.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo...Provide American Red Cross Learn- to-Swim classes, youth swim team, youth water...

Last Modified: 12/16/2020

ApxA1_AQandGHGTechnicalReport.pdf

micrometers or less ppb Parts per billion ppm Parts per million PV Photovoltaic PVC...Vinyl chloride is used in the process of making polyvinyl chloride...

Last Modified: 07/09/2021

DEIR Appendix G-3 (LaTerra).pdf

2598 2599 2600 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611...sta ar (bias correected MLE) 4410 nu u hat (MLE) 2688 nu star (bias s corrected)...

Last Modified: 05/04/2021

PROPOSED BUDGET FY 26-27

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 05/01/2026

2021_planning_Burbank2035 EIR Appendices A-E.pdf

184 582 1841 5820 4 Buena Vista Vanowen Victory 68.0 59.6 60.0 69.2 83 261 826 2611

Last Modified: 07/29/2021

Appendix A - Air Quality Technical Report.pdf

micrometers or less ppb Parts per billion ppm Parts per million PV Photovoltaic PVC...Vinyl chloride is used in the process of making polyvinyl chloride...

Last Modified: 01/07/2025

20211026-FY-2021-22-ADOPTED-BUDGET

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 10/26/2021

20220421-FY-2022-23-Proposed-Annual-Budget-Final.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 04/21/2022

20240502-FY-2024-25-Proposed-Budget-COMPLETE

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 05/02/2024

20201210.AdoptedBudget20_21.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 12/10/2020

20201210.AdoptedBudget18_19.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 12/10/2020

20201210.AdoptedBudget19_20.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 12/10/2020

20230504-FY-2023-24-Proposed-Budget-Final.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 05/04/2023

FY 2021-22 Proposed Budget.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 04/22/2021

UpperLARiver_Draft_Appendix3.pdf

ethylhexylpthalate is a plasticizer used in the manufacture of polyvinyl chloride (PVC

Last Modified: 03/25/2021

20230911-FY-2023-24-Adopted-Budget-Complete.pdf

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 09/11/2023

FY 2025-26 Proposed Budget

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 05/01/2025

FY 2025-26 Adopted Budget_Complete

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 09/11/2025

FY 2024-25 Adopted Budget_Final

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 09/05/2024

20220901-FY-2022-23-ADOPTED-BUDGET-COMPLETE

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 09/01/2022

FY 2026-27 Adopted Budget Book FINAL

Coordinate and provide programming for lap swim, master swim team, youth water polo

Last Modified: 09/10/2026

20210301_CityofBurbankAvionDraftEIR_Avion.pdf

systems for buried metal such as protective coatings, wrappings, or use the use of PVC

Last Modified: 03/31/2021

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

aggregate would be comprised of recycled concrete material and the proposed use of PVC

Last Modified: 12/13/2024

DEIR Appendix J (LaTerra).pdf

.: 1496 2908 85 1496 2993 1496 1496 1496 1496 1496 2611 382 ---------

Last Modified: 05/04/2021

Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

10/17/2025 Plans 199 Electrical Plans WORK BY CONTRACTOR: 1)INSTALL NEW 3” PVC

Last Modified: 07/20/2026

2026.07.02 Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

Electric 10/17/2025 Plans 199 Electrical Plans WORK BY CONTRACTOR: 1)INSTALL NEW 3” PVC

Last Modified: 07/17/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet