Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat.
Search Results

2022 Structural Design Correction List

the following height to width ratios: 2:1 for wood structural panels; 2:1 for gypsum...☐ Portland cement plaster (stucco), gypsum lath and...

Last Modified: 02/09/2026

DEIR Appendix K (LaTerra).pdf

Table 1 Projected Total Water Demand Water Use Type Amount (AFY) Indoor1 498.5...I 2611 ~ i 27 : I 281, II I. II accumulate by In...

Last Modified: 05/04/2021

2025 TI Correction List

Total area of windows shall not exceed 25% of the area of common wall with any room...Draftstopping materials shall not be less than 1/2” gypsum...

Last Modified: 05/28/2026

202101_Plans_ 4210 National 4-2-2021 (combined).pdf

A MINIMUM OF 50% OF THE TOTAL RATED A MINIMUM OF 50% OF THE TOTAL RATED WATTAGE...ALL DRYWALL SHALL BE 5/8" THICK TYPE "X"...

Last Modified: 06/07/2021

1100 W Victory Blvd Plans.pdf

JOISTS ON CENTER NUMBER SIMILAR REQUIRED MINIMUM SQUARE GALVANIZED FOOT, FEET GYPSUM...DRAWING NUMBER DRAWN ON B CONSTRUCTION TYPE: OCCUPANCY TYPE: ZONING: C-2 ...

Last Modified: 11/23/2022

20210101_608_N_Bel_Aire_ProjectPlans.pdf

38'-0" 638 36'-0" TOTAL...TOTAL LOT COVERAGE 50% OF LOT AREA=4473 S.F. (N) SFD FOOTPRINT 2307 S.F....- GALVANIZED...

Last Modified: 04/13/2021

Att3 - Management District Plan

• Welcomed Hilton Garden Inn, bringing Burbank’s hotel total to 17....• Produced Elephant Parade 2024 public art campaign, generating 439K...

Last Modified: 11/06/2025

20210101_3209_N_Castleman_Lane_ProjectPlans.pdf

TOTAL 14,481 SQ. FT....AMOUNT TO BE DETERMINED BY MEASUREMENTS. - ADD AGRICULTURAL GYPSUM....TOTAL 14,481 SQ. FT.

Last Modified: 04/13/2021

Decision Letter - Approved - Project No. 25-0001099 - MSE - 1800 Karen St 8.26.25

Interior finish material of 5/8” Type ‘X’ gypsum board is required. c.

Last Modified: 09/03/2025

Project Plans - 3036 SCOTT RD.

GYPSUM BOARD H.B. HOSE BIB H.C. HOLLOW CORE HDR. HEADER H.M........................................ 2,495.0 (N) 8'-0" (E) 26'-9" (N) 14'-6" TOTAL

Last Modified: 02/07/2025

3036 SCOTT RD - Approved Plans

GYPSUM BOARD H.B. HOSE BIB H.C. HOLLOW CORE HDR. HEADER H.M........................................ 2,495.0 (N) 8'-0" (E) 26'-9" (N) 14'-6" TOTAL

Last Modified: 03/03/2025

BAA Fall 2022

Last Modified: 07/28/2025

2023 BAA Fall Show

Last Modified: 07/28/2025

3105 AMIGOS AVE - 2026 submittal

[CBC 1804.4] TOTAL FLOOR AREAS: EXISTING RESIDENCE: 2,259 S.F....20.85' 10. 3129 AMIGOS DR - 21.10' 11. 3135 AMIGOS DR - 20.16' 10 PROPERTIES -...

Last Modified: 07/21/2026

3411 Viewcrest Dr - Final Plans.pdf

AREA OF (E) ROOF = 3,999.39 SF TOTAL AREA OF (E) ROOF TO BE DEMOLISHED = 239.07...SECTION 2 7/8" STUCCO 1/2" PLYWOOD METAL MESH R-15 INSULATION 5/8" TYPE X...

Last Modified: 06/15/2023

1821 N Bel Aire Dr_Planning Approved Plans

TOTAL RFA: 2,407 SF. < 2,693.7 SF....THE TOTAL RFA DOES NOT EXCEED 35% OF THE LOT AREA OR 2,693.7 SF. 7,500 SF....UNDER-STAIR SURFACE AND ANY...

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

TOTAL RFA: 2,407 SF. < 2,693.7 SF....THE TOTAL RFA DOES NOT EXCEED 35% OF THE LOT AREA OR 2,693.7 SF. 7,500 SF....UNDER-STAIR SURFACE AND ANY...

Last Modified: 05/06/2026

607 S Glenoaks Blvd - Plans_combined

./35 = 4.3 TOTAL OCCUPANT LOAD = 187.16 = 187 REQUIRED EXITS...concrete ceiling drop ceiling per details on sheet D-1 NOTE: Provide 5/8" Type "X"...

Last Modified: 03/21/2024

1018 N Sunset Canyon Dr_Project Plans

TOTAL ATTIC AREA: 3,665 SQ.FT. 3,665 X 144 = 527,760 SQ....THE TYPE AND SPACING OF RESILIENT CHANNELS AND CLIPS AND THE ATTACHMENT OF GYPSUM...NO...

Last Modified: 03/04/2025

2026 JAN ISSUED

TOTAL SF 4600....2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600102 2611...TOTAL...

Last Modified: 02/06/2026

Valley Skate Park_old

Last Modified: 09/17/2025

The Colony Theatre Proposal_City of Burbank RFP 2023.pdf

ESTIMATED TOTAL ATTENDANCE LEVELS in the FIRST FIVE (5) YEARS of OPERATION………………...Estimated total attendance levels in the first five (5) years...

Last Modified: 09/20/2023

Original Application.pdf

Membrane Mechanical Maximum Material Not in Contract Maintenance Ground Grade Gypsum...TOTAL REQUIRED: 25+97+2 = 124. PROPOSED ZERO PARKING....

Last Modified: 11/24/2025

1048 Sherlock Dr - (4-16-25)

: LIQUEFACTION: 17,110 SF 3,071 SF 2,368 SF + 1,811 SF = 4,179 SF 4,199 SF TOTAL.... 7/8" STUCCO 1/2" PLYWOOD METAL MESH INSULATION PER TITLE-24 5/8" TYPE X...

Last Modified: 06/23/2025

20210101_1258_E_Elmwood_ProjectPlans.pdf

FEET FTG FOOTING FUR FURRED, FURRING FUT FUTURE GA GAUGE, GAGE GALV GALVANIZED GB GYPSUM.../ STEEL GL GLASS, GLAZING GLB GLASS BLOCK OR GLUE LAM BEAM GLF GLASS FIBER GPL...

Last Modified: 04/13/2021

4100 Riverside Dr - Project Plans.pdf

FOOT, FEET FOOTING FURRING, FURRED NATURAL GAS GAUGE GALVANIZED GROUND GRADE GYPSUM...: 3 REQUIRED BIKE PARKING: 5% OF TOTAL REQUIRED...

Last Modified: 10/13/2022

2500 NHW_Proposed Plans.pdf

DQ ACC-K ACC-DQ TOTAL ACC-K ACC-DQ TOTAL TOTAL 2ND FLOOR 22 11 1 1 35 22...SPACE TOTAL ...

Last Modified: 01/09/2025

Attachment 4.pdf

DQ ACC-K ACC-DQ TOTAL ACC-K ACC-DQ TOTAL TOTAL 2ND FLOOR 22 11 1 1 35 22...SPACE TOTAL ...

Last Modified: 09/22/2026

Attachment 4.pdf

DQ ACC-K ACC-DQ TOTAL ACC-K ACC-DQ TOTAL TOTAL 2ND FLOOR 22 11 1 1 35 22...SPACE TOTAL ...

Last Modified: 09/22/2026

Appendix G - Geotechnical Report.pdf

The white powder usually consists of soluble salts such as gypsum, calcite, or...The total deflection of the anchor during the 200 percent quick...

Last Modified: 01/07/2025

UpperLARiver_Draft_Appendix5.pdf

Copper (g) 2.4 0.1 95% 5.7 0.4 94% Total Lead (g) 1.9 0.1 95% 5.1 0.3 94% Total...cottonwood √ tree Populus trichocarpa Black Cottonwood √ √ √...

Last Modified: 03/25/2021

2021_Planning_802 E. Angeleno - Architectural - 08.05.21.pdf

FRONT PROPOSED 2 CAR GARAGE PROPOSED ADDITION PROPOSED COVERED PATIO AT REAR TOTAL...EXTERIOR LENGTH = 208'-8" TOTAL INTERIOR LENGTH = 138'...

Last Modified: 08/26/2021

Plans.pdf

HIGH-STRENGTH BOLTING AutoCAD SHX Text STRUCTURAL MASONRY AutoCAD SHX Text REINFORCED GYPSUM...AutoCAD SHX Text %%ULIVING AREA TOTAL AutoCAD SHX...

Last Modified: 04/06/2022

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

HILLSIDE ZONE: METHANE ZONE: LIQUEFACTION: 14,469.20 SF 8,000 SF 8,000 SF TOTAL...14,469.20 SF LOT = 55% < 45% ALLOWED 8,000 SF TOTAL...

Last Modified: 04/12/2024

FY 2024-25 Adopted Budget_Final

Burbank Cultural Arts Commission partnered with Visit Burbank by sponsoring an elephant...painted by a local artist which will be displayed as part of the traveling...

Last Modified: 09/05/2024

6-22-21 PH - ATTACHMENT 1

2022 Total 2022 Total Total Water Use Total Water Use [Use Worksheet] 12,777...

Last Modified: 06/10/2021

PLANS RIVR_DensityBonusApp_231121_R2.pdf

TOTAL UNIT MIX UNIT TYPE QUANTITY AVERAGE AREA % OF TOTAL ONE BEDROOM 30 836 SF...SIZE FOOT, FEET FURRING, FURRED NATURAL GAS GAUGE ...

Last Modified: 12/21/2023

2025 OCT ISSUED

TOTAL SF:3000....TOTAL SF:6000....Improvement $65,000.00Valuation: TI - Architectural - New 15' high Metal Frame and Gypsum

Last Modified: 11/03/2025

920 E Grinnell Dr - Project Plans - 12-16-22.pdf

ACCESS DOORS PROVIDED THE INTERIOR OF THE GARAGE IS SHEATHED WITH 5/8" TYPE 'X' GYPSUM...ACCESS DOORS PROVIDED THE INTERIOR OF THE GARAGE IS SHEATHED WITH 5/8" TYPE 'X'...

Last Modified: 02/09/2023

Library: 90's Movie Night featuring Clueless

amp; Beverly Hills Chic Dress Code (Theme Optional): Plaid, preppy, and totally ...friends, bring your favorite movie snacks and refreshments, and get ready for a totally

Last Modified: 09/11/2026

2021_Planning_Plans_4336 CLYBOURN AVE_may submittal.pdf

Glvanized Iron GL Glass, Glazing GND Ground GR Grade GYP Gypsum H High H.B....CLYBOURN AVE EXISTING AREA DEMOLISHED AREA ADDITION AREA PROPOSED AREA EXEMPTION...

Last Modified: 07/22/2021

UpperLARiver_Draft_Appendix4a.pdf

34.0096485 ‐118.3283460 Los Angeles 5014024900 3.69 16.86 L A UNIFIED SCHOOL DIST 2611...33.9959257 ‐118.3219655 Los Angeles 5014024901 0.28 16.86 L A UNIFIED SCHOOL DIST...

Last Modified: 03/25/2021

2021_planning_Burbank2035 EIR Appendices A-E.pdf

Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4...Fugitive PM2.5 Exhaust PM2.5 PM2.5 ...

Last Modified: 07/29/2021

Soft-Story Affected Buildings List

BLK1021 W CLARK AVE 91506-2006 5 OR MORE UNITS/4 STRY OR LESS 1961 2479-004-013 2611...W CLARK AVE LOT 34 2611 W CLARK AVE 91505-3263 5 OR MORE...

Last Modified: 04/02/2024

20210301_AppendixEGeotechInvestigat_Avion.pdf

The office development will consist of ten (10), one to two story structures totaling...130,00 square feet and the retail will comprise of two buildings with a...

Last Modified: 03/31/2021

Private-Hauler-Quarterly-Report

R Tons: 0 Total L Tons: 0 Total L Wood: Total L Solid Waste: Total Tons Received...Refuse:...

Last Modified: 05/22/2026

DEIR Appendix I (LaTerra).pdf

incorporated into the Project:  Walls: 6-inch wood stud wall with two layers of 5/8” gypsum...completed using structural materials, walls should be construction to...

Last Modified: 05/04/2021

1. JAN 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - January Total Collisions YTD Total Collisions...Pedestrian Collisions - January...

Last Modified: 12/15/2025

2. FEB 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - February Total Collisions YTD Total Collisions...Pedestrian Collisions - February...

Last Modified: 12/15/2025

3. MAR 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - March Total Collisions YTD Total Collisions...Pedestrian Collisions - March...

Last Modified: 12/15/2025

4. APR 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - April Total Collisions YTD Total Collisions...Pedestrian Collisions - April...

Last Modified: 12/15/2025

5. MAY 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - May Total Collisions YTD Total Collisions...Bicycle Collisions - May...

Last Modified: 12/15/2025

6. JUN 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - June Total Collisions YTD Total Collisions...Bicycle Collisions - June...

Last Modified: 12/15/2025

7. JUL 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - July Total Collisions YTD Total Collisions...Bicycle Collisions - July...

Last Modified: 12/15/2025

8. AUG 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - August Total Collisions YTD Total Collisions...Pedestrian Collisions - August...

Last Modified: 12/15/2025

9. SEP 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - September Total Collisions YTD Total Collisions...Pedestrian Collisions -...

Last Modified: 12/15/2025

10. OCT 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - October Total Collisions YTD Total Collisions...Pedestrian Collisions - October...

Last Modified: 12/15/2025

11. NOV 2025 Traffic Report.pdf

Collisions 2021-2025 Total Collisions - November Total Collisions YTD Total Collisions...DUI Collisions - November...

Last Modified: 12/15/2025

1. JAN 2025 Traffic Report (1).pdf

Collisions 2021-2025 Total Collisions - January Total Collisions YTD Total Collisions...Pedestrian Collisions - January...

Last Modified: 12/15/2025

2. FEB 2025 Traffic Report (1).pdf

Collisions 2021-2025 Total Collisions - February Total Collisions YTD Total Collisions...Pedestrian Collisions - February...

Last Modified: 12/15/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet