Search Results

Showing results for "dWA 0852 2611 9277 [[Glorion Plafon]] Borong Pasang Plafon PVC Enggang Beji Kota Depok"

No results were found that matched the keywords: dWA 0852 2611 9277 [[Glorion Plafon]] Borong Pasang Plafon PVC Enggang Beji Kota Depok.
Search Results

2026.06.18 Pet. Metro's McKenna Declaration ISO PI Motion.pdf

INSTALL NEW PVC CONDUIT(S) AT CURRENT BWP STANDARD, 24"BELOW GRADE....INSTALL NEW PVC CONDUIT AT CURRENT BWP STANDARD, 24"BELOW GRADE.

Last Modified: 06/22/2026

250220_City of Burbank - Home Again Los Angeles

USE PVC FOR BELOW GRADE....USE PVC FOR BELOW GRADE..../S DR 11 C PVC COPPER D WV ABS O R PVC...

Last Modified: 02/25/2025

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 04/12/2024

2025 Residential Correction List (1)

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 09/08/2026

DEIR Appendix G-4A (LaTerra).pdf

VOLUME FLUID USED 10/10/2017 81' bgs 3/4" PVC 0.020" Horizontal 2" N/A N/A...VOLUME FLUID USED 10/10/2017 53' bgs 3/4" PVC 0.020"...

Last Modified: 05/04/2021

Updated_Preliminary_Low_Impact_Development_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 10/29/2024

Preliminary_Low_Impact_Development_Report

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/14/2024

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/11/2023

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 06/26/2023

Preliminary_LID_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 01/11/2024

Appendix F_HazMat Studies_Part 2.pdf

One- inch diameter polyvinyl chloride (PVC) casing was used as a guide for the tubing...approximately one- foot long sand pack around the polypropylene filter, at which...

Last Modified: 12/13/2024

Project Plans - 2925 N Lamer St

PVC SCH 40.

Last Modified: 02/07/2025

2925 N Lamer St_Plans_c4_1.27.25

PVC SCH 40.

Last Modified: 03/04/2025

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600102 2611

Last Modified: 02/06/2026

Soils Report.pdf (1)

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 06/23/2023

Soils Report.pdf

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 02/08/2023

20210507_630_Parish Pl_Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 05/07/2021

20210519_504_Hampton_Road.pdf

BY RIGID CONDUIT, INTERMEDIATE CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 05/18/2021

2021_Planning_630_S_Parish_Pl_Approved Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 06/28/2021

Plans formal submittal #2_Part3

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

1. Police Commission_Redacted.pdf

TCP/IP, IPX, AppleTalk, Ethernet, FE, GE, IEEE 802.1Q, VRRP/HSRP, SIP, POS, ATM PVC

Last Modified: 06/15/2023

UpperLARiver_Draft_Appendix7.pdf

maintenance (MH), including Shoring, per Plan $ 36,800.00 1 17 Install 12" ø PVC...than 0.5 in/hr and should meet the following criteria:  Minimum 4-inch slotted,...

Last Modified: 03/25/2021

UpperLARiver_Draft_Appendix5.pdf

Inlet Pipe Diameter/Type (i.e. 8” / PVC): ___________________________________...Inlet Pipe Invert Elevation if applicable: 13a Inlet Pipe DiameterType ie 8 ...

Last Modified: 03/25/2021

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214 DWA

Last Modified: 07/25/2023

2026 FEB ISSUED

$50,000.00Valuation: RE-ROOF GARAGE STRUCTURE (5000 SF): REMOVE (E) ROOF, INSTALL NEW 60 MIL PVC

Last Modified: 03/03/2026

3411 Viewcrest Dr - Final Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/15/2023

3000 Haven Way, Burbank, CA 91504 - ARCH SET - UPDATED SET 1.9.25

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 01/28/2026

2025 NOV ISSUED

Commercial Repair and Maintenance $20,000.00Valuation: reroof - full tear off, install PVC

Last Modified: 12/01/2025

Combined Attachments A-N.pdf

######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214 DWA

Last Modified: 05/24/2023

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø PVC...PRESSURE DISCHARGE 2"Ø PVC SCH 40 PIPE SUBDRAIN. 4"...

Last Modified: 03/11/2026

Appendix 11.1E_Phase I II ESA.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 11/29/2021

2025 AUG ISSUED

INSTALL NEW SARNAFIL PVC SINGLE PLY ROOF 1000 SF Commercial Roofing Systems, Inc

Last Modified: 09/02/2025

20210401_3700RD_Appendix_E.pdf

Each acetate liner was cut using a 1-inch diameter polyvinyl chloride (PVC) pipe-cutter

Last Modified: 04/12/2021

2026.07.27 Pet. Metro's DeFrenza Declaration ISO Motion for Reconsideration

Burbank - BWP Electric 5/8/2026 Plans 198 Traffic Signal Plans INSTALL NEW 3-INCH PVC...PW Traffic 5/19/2026 Plans 31 Traffic Signal Plans Note 11 install new 3-inch...

Last Modified: 08/06/2026

1048 Sherlock Dr - (4-16-25)

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/23/2025

2026 APR ISSUED

and Maintenance $26,701.71Valuation: NONRESIDENTIAL RE-ROOF; OVERLAY, DURO-LAST PVC

Last Modified: 05/28/2026

2026 MAY ISSUED

$77,000.00Valuation: REROOF - AT LOW SLOPE ROOF AREAS, INSTALL NEW SARNARIL 72 MIL THICK PVC

Last Modified: 06/15/2026

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 02/16/2024

2025 FEB ISSUED

HOLLYWOOD WAY Plumbing $175,000.00Valuation: PIPE REPLACEMENT: 560 LF TRENCH (3) 2.5" PVC

Last Modified: 03/10/2025

1310 E Tujunga Ave - PLANS

conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 04/03/2026

2814 Empire Plans.pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/13/2022

Attachment 4 (3).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

Attachment 4 (4).pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/20/2022

Attachment 4..pdf

MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC

Last Modified: 10/27/2022

526 S. SUNSET CYN DR - Project Plans - 09-29-23

WHERE OCCURS 4' -0 " 4 X - CONT. 2% SLOPE PVC FLR.

Last Modified: 01/23/2024

20140101_2014_2021_Housing_Element.pdf

2621 N Glenoaks Blvd 1999 Single Family Residence 1 5,227    0.12 69 2472‐019‐020 2611

Last Modified: 03/24/2021

20140101_2014_2021_Housing_Element (1).pdf

2621 N Glenoaks Blvd 1999 Single Family Residence 1 5,227    0.12 69 2472‐019‐020 2611

Last Modified: 03/24/2021

2244 N. Buena Vista CEST and Appendices_06.16.2025_KH signed.pdf

Number: CC2596-1 August 29, 2023 C40 G&P Service Inc C41 Peterson Auto Care 2611...DATA MICROFILIMING CORP Cole Information 1992 DATA MICROFILMING Cole Information ...

Last Modified: 06/17/2025

6-22-21 PH - ATTACHMENT 1

I 2611 ~ i 27 : I 281, II I. II accumulate by In Lieu Storage....I " ': 22 ii 23 L 24 II il 251 2611 :, 27 " 2sl!

Last Modified: 06/10/2021

DEIR Appendix F (LaTerra).pdf

SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET (1 CU. FT./FT.)

Last Modified: 05/04/2021

ApxA1_AQandGHGTechnicalReport.pdf

micrometers or less ppb Parts per billion ppm Parts per million PV Photovoltaic PVC...Vinyl chloride is used in the process of making polyvinyl chloride...

Last Modified: 07/09/2021

DEIR Appendix G-3 (LaTerra).pdf

2598 2599 2600 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611...sta ar (bias correected MLE) 4410 nu u hat (MLE) 2688 nu star (bias s corrected)...

Last Modified: 05/04/2021

2021_planning_Burbank2035 EIR Appendices A-E.pdf

184 582 1841 5820 4 Buena Vista Vanowen Victory 68.0 59.6 60.0 69.2 83 261 826 2611

Last Modified: 07/29/2021

Appendix A - Air Quality Technical Report.pdf

micrometers or less ppb Parts per billion ppm Parts per million PV Photovoltaic PVC...Vinyl chloride is used in the process of making polyvinyl chloride...

Last Modified: 01/07/2025

UpperLARiver_Draft_Appendix3.pdf

ethylhexylpthalate is a plasticizer used in the manufacture of polyvinyl chloride (PVC

Last Modified: 03/25/2021

20210301_CityofBurbankAvionDraftEIR_Avion.pdf

systems for buried metal such as protective coatings, wrappings, or use the use of PVC

Last Modified: 03/31/2021

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

aggregate would be comprised of recycled concrete material and the proposed use of PVC

Last Modified: 12/13/2024

DEIR Appendix J (LaTerra).pdf

.: 1496 2908 85 1496 2993 1496 1496 1496 1496 1496 2611 382 ---------

Last Modified: 05/04/2021

Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

10/17/2025 Plans 199 Electrical Plans WORK BY CONTRACTOR: 1)INSTALL NEW 3” PVC

Last Modified: 07/20/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet