Search Results

Showing results for "dWA 0859 3970 0884 Ongkos Pasang Canopy Atap Teras Samping Murah Magelang"

No results were found that matched the keywords: dWA 0859 3970 0884 Ongkos Pasang Canopy Atap Teras Samping Murah Magelang.
Search Results

Revised FY 2025-26 Adopted Fee Schedule FINAL

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 09/17/2025

25-4,034 Adopting by Reference 2025 CA Building Standards Code

The design for the seismic deflection of return walls, and fins/canopies at entrances

Last Modified: 11/24/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 12/12/2025

20250625 (3).fy25_26feescheduleadopted.pdf

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 03/18/2026

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

approximately 60 trees planted in the City’s right-of-way and 230 interior and canopy...project would plant drought tolerant landscaping and approximately 230 interior...

Last Modified: 09/10/2021

2021_Planning_2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

approximately 60 trees planted in the City’s right-of-way and 230 interior and canopy...project would plant drought tolerant landscaping and approximately 230 interior...

Last Modified: 09/14/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

approximately 60 trees planted in the City’s right-of-way and 230 interior and canopy...project would plant drought tolerant landscaping and approximately 230 interior...

Last Modified: 09/10/2021

The Burbank2035 General Plan

Program Develop a comprehensive re-forestation program to expand the City’s tree canopy

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

Program Develop a comprehensive re-forestation program to expand the City’s tree canopy

Last Modified: 11/17/2021

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Year Student Film Permit $25.00 Each Temporary Membrane Structures, Tents, and Canopies

Last Modified: 03/17/2026

Burbank2035_Updated (002)

Program Develop a comprehensive re-forestation program to expand the City’s tree canopy

Last Modified: 03/24/2026

20260421-GeneralPlan-001.pdf

Program Develop a comprehensive re-forestation program to expand the City’s tree canopy

Last Modified: 04/21/2026

20210301__FinalAvionFEIR_Avion.pdf

 Expand the tree canopy and reducing the heat island effect by planting new trees

Last Modified: 03/31/2021

Con Plan -IDIS FINAL.pdf

Burbank is addressing this by expanding tree canopy, promoting energy-efficient

Last Modified: 09/15/2025

Con Plan -IDIS FINAL (1).pdf

Burbank is addressing this by expanding tree canopy, promoting energy-efficient

Last Modified: 04/15/2026

Appendix B - Phase I ESA.pdf

F R Pacific Telephone 1946 la Schulze a Eu Pl Los Angeles Directory Co. 1942 Samp

Last Modified: 01/07/2025

20210301_CityofBurbankAvionDraftEIR_Avion.pdf

• Expand the tree canopy and reducing the heat island effect by planting new trees...• Expand the tree canopy and reducing the heat island effect...

Last Modified: 03/31/2021

HE Final-EIR.pdf

result in injury or mortality of the tree causing additional loss of trees and canopy...result in injury or mortality of the tree causing additional loss of trees and...

Last Modified: 11/28/2022

ATTACHMENT 12-with page numbers - reduced.pdf

result in injury or mortality of the tree causing additional loss of trees and canopy...result in injury or mortality of the tree causing additional loss of trees and...

Last Modified: 09/16/2022

2026.05.20-LA Metro BRT Lawsuit COB-001.pdf

Pasadena Project Work (including with respect to bus charger masts and bus stops and canopies...Pasadena Project Work (including with respect to bus charger masts and bus...

Last Modified: 06/01/2026

2026.05.20-Summons & Complaint-001.pdf

Pasadena Project Work (including with respect to bus charger masts and bus stops and canopies...Pasadena Project Work (including with respect to bus charger masts and bus...

Last Modified: 06/01/2026

20210107-2012-Series-A-BWP-Revenue-Refunding-Bonds.pdf

improvements to increase overall productivity and efficiency, a photovoltaic system as canopies

Last Modified: 01/07/2021

CE Report - Project No 19-0005588_529-537 E Palm Ave.pdf

access 51.93122033 Retail density 92.87822405 Supermarket access 79.5072501 Tree canopy

Last Modified: 12/07/2023

20260601-2026.05.20 Summons & Complaint reduced-001.pdf

Pasadena Project Work (including with respect to bus charger masts and bus stops and canopies...Pasadena Project Work (including with respect to bus charger masts and bus...

Last Modified: 06/01/2026

UpperLARiver_Draft_Appendix4a.pdf

stormwater management, including pedestrian safety and traffic calming, street tree canopy

Last Modified: 03/25/2021

Attachment 2 – 2025-2029 Consolidated Plan

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 05/29/2025

Attachment 2 – Annual Action Plan

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 05/29/2025

Attachment 2 – 2025-2029 Consolidated Plan.pdf

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 06/02/2025

CON PLAN FINAL.pdf

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 06/18/2025

CON PLAN FINAL (1).pdf

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 07/17/2025

2025-2029 CON PLAN DRAFT.pdf

Burbank is prioritizing climate resilience strategies such as expanding urban tree canopy

Last Modified: 07/21/2025

801 South Sixth Street_SB 35 Decision Letter_FINAL 2

overhanging ATTACHMENT 3-23 24 structural elements, including balconies or canopies

Last Modified: 09/10/2025

801 South Sixth Street_SB 35 Decision Letter_FINAL2

overhanging ATTACHMENT 3-23 24 structural elements, including balconies or canopies

Last Modified: 02/25/2026

250220_City of Burbank - Home Again Los Angeles

Shade provided by a canopy shade system consisting of solar panel arrays 5 A copy

Last Modified: 02/25/2025

Appendix A - Air Quality Technical Report.pdf

Fairview Project - const eq max day Detailed Report, 12/23/2024 35 / 37 Tree canopy...access 54.08700115 Retail density 73.97664571 Supermarket access 45.0019248 Tree...

Last Modified: 01/07/2025

20210301_AppendixGHazardsandHazardous2_Avionre.pdf

Compressor was observed beneath a wooden and corrugated steel canopy and elevated

Last Modified: 03/31/2021

Appendix F_HazMat Studies_Part 1.pdf

Not identified Plumbing TI for all guestrooms 2008 Not identified Add exterior canopy

Last Modified: 12/13/2024

2244 N. Buena Vista CEST and Appendices_06.16.2025_KH signed.pdf

Supermarket access 45.0019248 Buena Vista Detailed Report, 8/28/2024 44 / 46 Tree canopy

Last Modified: 06/17/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet