Search Results

Showing results for "SB 9 Urban Lot Split Eligibility Application"

No results were found that matched the keywords: SB 9 Urban Lot Split Eligibility Application.
Search Results

SR - SB 423 Extension Urgency Ordinance Staff Report - 01.23.2024.pdf

As of January 1, 2024, the general plan applicable to the site contains, and has...that, for the purposes of providing clarity when determining “qualified site”...

Last Modified: 01/11/2024

4.25.23 - Introduction Letter and Project Summary.pdf

Map, the project will comply with the SB 35 labor provisions as applicable....Criterion #9: Prevailing Wage The Project...

Last Modified: 05/08/2023

4.25.23 - Introduction Letter and Project Summary.pdf 1

Map, the project will comply with the SB 35 labor provisions as applicable....Criterion #9: Prevailing Wage The Project...

Last Modified: 06/26/2023

BVP Application

5370 Fax: (818) 238-5388 [email protected] Check the boxes that apply: * All applicants

SB35 Criteria Letter_2022-02-15.pdf

with either ornamental landscape, the bowling center sign, or a surface parking lot...SB 35 Eligibility Checklist ...

Last Modified: 03/04/2022

9.20.2023_3000 W Empire Ave_Status_Letter and Attachments.pdf

The Project is consistent with this SB 35 eligibility criteria. 3....For purposes of SB 35,...

Last Modified: 10/02/2023

Project Applicant's Submitted Consistency Matrix

The project is therefore eligible for SB35. YES ARTICLE 9....Zone and was submitted as an SB 35...

Last Modified: 09/25/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet