Search Results

Showing results for "SB 9 Urban Lot Split Eligibility Application"

No results were found that matched the keywords: SB 9 Urban Lot Split Eligibility Application.
Search Results

2025 AUG ISSUED

Install 1 2-Ton split-system for MDF room....ORANGE GROVE AVE Demolition $0.00Valuation: DEMO (E) SINGLE FAMILY DWELLING (CLEAR LOT.../2025 ...

Last Modified: 09/02/2025

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

(5) Tribal Conulation $629.00 Application (6) SB 35 Application** $5,996.00 Application...(NOI)...

Last Modified: 06/20/2022

Attachment 1 - Proposed Ordinance CCO edits

Sections 9-3-105, 9-3-107, and 9-3-108 of BMC Title 9, Chapter 3, Environmental...Distance...

Last Modified: 02/13/2025

1115 S LAKE ST UPDATED DRAWINGS

RESIDENTIAL AND COMMERCIAL DEMO: THE COMPLETED WMP MUST BE SIGNED BY THE APPLICANT...THE VENDOR OR FACILITY THAT THE APPLICANT PROPOSES TO USE TO...

Last Modified: 08/20/2025

CON PLAN FINAL (1).pdf

These households are evenly split between homeowners (50.3%) and renters (49.7%...Discovery Ranch Lot Studios, a 30-acre studio campus with 16...

Last Modified: 07/17/2025

2025-2029 CON PLAN DRAFT.pdf

These households are evenly split between homeowners (50.3%) and renters (49.7%...Discovery Ranch Lot Studios, a 30-acre studio campus with 16...

Last Modified: 07/21/2025

CON PLAN FINAL.pdf

These households are evenly split between homeowners (50.3%) and renters (49.7%...Discovery Ranch Lot Studios, a 30-acre studio campus with 16...

Last Modified: 06/18/2025

BFF-COU Employees (1).pdf

1/1/07: $556.17/month towards Medical Plan plus additional medical premium if eligible...years of service…six (6) 24 hour shifts 8-16 years of service……........nine...

Last Modified: 03/10/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet