Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"
GAGE WEEP SCREED W/3-1/2" FLANGE AT STUCCO SIDING, MIN. 4" ABOVE EARTH OR 2" ABOVE PAVED
Last Modified: 09/28/2026
public works approval of proposed procedures [>200 cy] (2016 cbc 7007.1) 6 All paved...PEDESTRIAN PATH W/ CITY-APPROVED PAVED SURFACE MATERIAL ...
Last Modified: 02/25/2025
Examples include avoiding paving and grinding operations during the rainy season...The Project site and surrounding areas are largely paved,...
Last Modified: 12/13/2024
that would require approximately 15,000 square feet of additional excavation and paving...Total areas paved both within the Project site and on...
Last Modified: 05/04/2021
IN CASE OF CONFLICT OF INDICATED PAVING OR SLAB SLOPES WITH CIVIL DRAWINGS, THE CIVIL...CONCRETE PAVING PERVIOUS PAVING ...
Last Modified: 02/12/2024
sidewalks of adequate width, benches, street trees and landscaping, decorative paving
Last Modified: 11/17/2021
The remainder of the Site consists of asphalt-paved parking areas and driveways,
Last Modified: 07/09/2021
Enhanced stamped paving at main project entry.
Last Modified: 05/08/2023
Showing 353 to 360 of 500 entries.