Showing results for "dWA 0812 2782 5310 Biaya Kontraktor Interior Ruang Jemur Pakaian Murah Depok Sleman"
E4.0 ELECTRICAL ROOF PLAN E5.0 ELECTRICAL SINGLE LINE DIAGRAM E6.0A ELECTRICAL INTERIOR...INTERIOR REMOVAL SCOPE TO INCLUDE REMOVAL OF TWO...
Last Modified: 03/25/2026
CONSTRUCT NEW NON-LOAD BEARING INTERIOR PARTITIONS, MILLWORK, FINISHES, & FIXTURES...Commercial Tenant Improvement 06/09/2025Permit Final Final Date:Permit Status: ...
Last Modified: 07/01/2025
The Project will include minor interior alterations to include partition walls to...The Project will include minor interior alterations to...
Last Modified: 03/19/2024
R-13 BATT INSULATION INTERIOR FINISH 2X WOOD STUD @ 16" O.C....INTERIOR FINISH REFER SCHEDULE PAINTED GYP....WINDOW FRAME ...
Last Modified: 01/31/2024
Last Modified: 02/15/2024
Applicant shall calculate the linear length of all exterior and interior walls....The Director also may reduce the interior side setback adjacent...
Last Modified: 01/27/2022
the reconstruction of a portion of the existing retaining wall located in the interior...the reconstruction of a portion of the existing retaining wall located in the...
Last Modified: 02/08/2022
The Project includes interior remodeling work to add a second restroom....The Project includes interior remodeling work to add a second restroom.
Last Modified: 05/10/2023
Showing 73 to 80 of 720 entries.