Showing results for "dWA 0812 2782 5310 Biaya Kontraktor Interior Ruang Jemur Pakaian Murah Depok Sleman"
The Applicant proposes demolition of interior walls within the existing basement
Last Modified: 08/21/2025
The applicant proposes demolition of interior walls within the existing living room
Last Modified: 06/16/2025
that are in an enclosed area from public view such as fenced backyards or the interior
Last Modified: 10/16/2025
features 5.507.4.2.1 Mandatory Documentation of compliance 5.507.4.2.2 Mandatory Interior
Last Modified: 02/09/2026
- Affordable units may be smaller in aggregate size and have different interior...features as long as interiors are of good quality, and...
SC2.03 SC4.01 EBTECH MODULAR BUILDING SYSTEM- NORTH LOBBY, SOUTH LOADING AREA, INTERIOR...SPECIFICATIONS AND CALCULATIONS LINKED EQUIPMENT MODULAR RESTROOMS LMG MEDIA...
Last Modified: 06/28/2021
PROPOSED REAR SET BACK = 28'-0" REQUIRED REAR SET BACK = 15'-0" REQUIRED INTERIOR...SIDE SET BACK = (10%)LOT WIDTH = 9'-10" PROPOSED...
Last Modified: 11/08/2023
Showing 209 to 216 of 720 entries.