Showing results for "dWA 0812 2782 5310 Jasa Pemasangan Kitchen Set ACP Serat Kayu Berkualitas Polanharjo Klaten"
Institutional Church 1000 SF 42.69 Church Seat 4.27 Community Center (No Kitchen
Last Modified: 04/13/2021
The project shall conform to the approved plan set on file with the Planning Division...demolition and new construction are required to provide a full MWELO plan check...
Last Modified: 08/24/2023
The facility includes seven classrooms and a full-size commercial kitchen....Includes five classrooms, a multi-purpose room, and a kitchen. ...
Last Modified: 09/22/2023
City Council-adopted Policy Considerations As DIFs are not required to be set at...This policy helps the City to set fees for various City...
Last Modified: 05/23/2022
Last Modified: 05/26/2022
Last Modified: 04/23/2026
where, each of the conditions have been addressed in the building permit plan set...reproduced on the construction document drawings as part of the Approved Construction...
Last Modified: 08/07/2024
required by BMC Section 10-1-1959(F): (1) The use applied for at the location set...Additionally, the screen is set back between 10’-0” and...
Last Modified: 10/18/2024
Showing 745 to 752 of 2,459 entries.