Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"
(B) (Equal to Total of A) Elderly (Of Total (B)) (62 and Over) Disabled...(Of Total (B)) Burbank Residents...
Last Modified: 05/29/2025
Last Modified: 06/04/2026
In Out Total In Out Total PROPOSED PROJECT Hotel [a] [b] 310 420 rooms 4,129 114
Last Modified: 12/13/2024
= 4.08 T = 7.33 U = 2.00 V = 2.00 W = 7.42 X = 9.92 Y = 25.50 _________________ TOTAL...12.00 Q = 12.42 S = 4.08 T = 7.33 U = 2.00 V = 2.00 X = 9.92 _________________...
Last Modified: 05/25/2021
As the project site is approximately 0.36-acre, the total allowable base number...As the project site is approximately 0.36-acre, the total...
Last Modified: 12/07/2023
Copper (g) 2.4 0.1 95% 5.7 0.4 94% Total Lead (g) 1.9 0.1 95% 5.1 0.3 94% Total...11.0 ac 3.7% of total 13.2 ac 4.5%...
Last Modified: 03/25/2021
If the project involves demolition and new construction, describe total project....separate exhibits 1 If the project involves demolition and new construction describe...
Last Modified: 03/31/2021
The total number of units in the Full Application has increased as compared to the...Notably, the base density of 20 units has not changed; the change in the...
Last Modified: 05/14/2024
Showing 561 to 568 of 2,302 entries.