Search Results

Showing results for "dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga"

No results were found that matched the keywords: dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga.
Search Results

2023.10.19 - BCEA MOU 2022 - 2024 - FINAL.pdf

ASSIGNMENT - KITCHEN Employees who are primarily assigned to work in a kitchen...- SOCIAL SERVICES COORDINATORS IN THE HOME DELIVERED MEAL...

Last Modified: 10/19/2023

20260630-FY-26-27-Adopted-Fee-Schedule

Without Kitchen $71.00 1-3 Hours With Kitchen $32.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/29/2026

20260814-FY-26-27-Adopted-Revised

Without Kitchen $71.00 $32.00 1-3 Hours With Kitchen Each Addl. Hr....1-3 Hours Without Kitchen Each...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

Without Kitchen $71.00 $32.00 1-3 Hours With Kitchen Each Addl. Hr....1-3 Hours Without Kitchen Each...

Last Modified: 09/22/2026

2026 JUL ISSUED

$4,700.00Valuation: INSTALLATION OF TWO NEW WALL MOUNTED ILLUMINATED SIGNS AND RELOCATE ONE SET...EXTENSIVE INTERIOR REMODEL; KITCHEN, DINING...

Last Modified: 08/10/2026

2025 APR ISSUED

Addition and Alteration $7,000.00Valuation: UNIT A- NON-STRUCTURAL REMODEL OF KITCHEN...FOR THE KITCHEN, REPLACE AND INSTALL NEW DISHWASHER, SINK...

Last Modified: 05/01/2025

Project Plans FINAL

SCOPE OF WORK BACKYARD REMODEL, NEW COVERED OUTDOOR KITCHEN (410 SF), NEW POOL (...249 1239.24 FL 248 1239.78 TX 246 1239.58 AC 217 1242.07 FH 31240.70 ...

Last Modified: 06/02/2026

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

CONTROL : THE FOLLOWING FINISH MATERIALS SHALL COMPLY WITH THE VOC CONTENT LIMITS SET...APPROVED SEWAGE DISPOSAL SYSTEM (R306.3) KITCHEN SINKS,...

Last Modified: 02/16/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet