Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Agen Erosion Control Mat Terdekat Pesawaran Lampung"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Agen Erosion Control Mat Terdekat Pesawaran Lampung.
Search Results

Departments

List of departments for the City of Burbank.

Last Modified: 10/01/2026

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 12/12/2024

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/20/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet