Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Grass Paver HDPE Bintan Kepulauan Riau"
PAVEMENT FD = FOUND FC = FACE OF FF = FINISH FLOOR FL = FLOWLINE FN = FENCE GR = GRASS
Last Modified: 01/31/2022
access routes to and from the Project site due to movement of construction workers, vendors...generate a maximum of 198 one-way construction worker trips (99 round trips)...
Last Modified: 11/05/2026
There are grass lawns, miscellaneous landscaping, and trees localized in planter
Last Modified: 07/09/2021
Trees in grass shall be installed with Arbor Guards. 86.
Last Modified: 10/27/2022
with approximately 4 million impressions based on estimates from the advertising vendor...Natural features such as rock and stone; permeable...
Last Modified: 10/29/2026
Agenda Mailing Service $150.00 Annually $3.00 Each Based on current rate set by vendor...Based on current rate set by vendor Staffing Costs:...
Last Modified: 06/20/2022
Agenda Mailing Service $150.00 Annually $3.00 Each Based on current rate set by vendor...Based on current rate set by vendor 4 ...
for the CPI’s leased cars and trucks index with transaction data purchased from a vendor
Last Modified: 06/11/2025
Showing 833 to 840 of 938 entries.