Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat.
Search Results

Appendix G_Hydrology and Water Quality.pdf

Pipe slope for the 60” Lockheed Storm Drain was acquired per the storm drain As-Built...Pipe slope for the private storm drain infrastructure...

Last Modified: 12/13/2024

Plans formal submittal #2_Part4

CUT SLOPES: THE MAXIMUM ALLOWABLE STEEPNESS OF CUT SLOPES IS 2:1....FILL SLOPES: THE ALLOWABLE...

Last Modified: 11/14/2024

Plans formal submittal #2_Part4 (1).pdf

CUT SLOPES: THE MAXIMUM ALLOWABLE STEEPNESS OF CUT SLOPES IS 2:1....FILL SLOPES: THE ALLOWABLE...

Last Modified: 11/14/2024

2/8/22 - PH - Attachment 4

Reduced FAR on Sloped Lots in the Hillside....Reduced FAR on Sloped Lots in the Hillside....Hipped and low slope roofs are...

Last Modified: 01/27/2022

Attachment 4 - Dec 13 2021 Plannin gboard Hearing Report and Exhibits.pdf

Reduced FAR on Sloped Lots in the Hillside....Reduced FAR on Sloped Lots in the Hillside....Hipped and low slope roofs are...

Last Modified: 01/27/2022

Stormdrain-Connection-Policy.pdf

fps at the point of connection for connections 24-inches in diameter or larger, slope...Show the slope of the pipe. 3....Need a minimum pipe...

Last Modified: 04/13/2021

3105 AMIGOS AVE - 2026 submittal

THE FINISH GRADE SHALL SLOPE A MIN....SWALES SHALL SLOPE A MINIMUM OF 2%. 8....THE GRADE SHALL FALL A MINIMUM OF 6" WITHIN THE FIRST 10FT (5%...

Last Modified: 07/21/2026

1048 Sherlock Dr - (4-16-25)

SLOPE 2% MIN. SLOPE 2% MIN. SLOPE 2% MIN....SLOPE 2% MIN. SLOPE 2%...

Last Modified: 06/23/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet