Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat.
Search Results

BPAP G001 SHEET

(BMC 9-1-1-3305) The finish grade shall slope a min. of 5%, or 6”, to point 10 feet...Swales shall slope a minimum of 2%.

Last Modified: 11/15/2024

G01 SHEET

(BMC 9-1-1-3305) The finish grade shall slope a min. of 5%, or 6”, to point 10 feet...Swales shall slope a minimum of 2%.

Last Modified: 05/30/2024

Attachment 1.pdf

Driveway slope and transition shall be constructed per Burbank Standard Plan BT-...Consistent 10-1-1604: DRIVEWAY SLOPES The project’s driveway...

Last Modified: 10/27/2022

2026-27 Annual Action Plan - FINAL 6.17.2026.pdf

funding recommendations; • Solicited comments for 30 calendar days; and • Held an agenized

Last Modified: 07/01/2026

FY 24-25 Annual Action Plan (1).pdf

recommendations;  Solicited comments for 30 calendar days; and  Held an agenized

Last Modified: 04/15/2026

2026-27 Annual Action Plan - DRAFT 5.1.26 FINAL.pdf

funding recommendations; • Solicited comments for 30 calendar days; and • Held an agenized

Last Modified: 05/01/2026

Att2 - Annual Action Plan

funding recommendations; • Solicited comments for 30 calendar days; and • Held an agenized

Last Modified: 06/04/2026

Planning_Attachments A-K_3001 W Empire Ave.pdf

Driveway Slopes (Section 10-1-1604) The slope of a driveway or driveway ramp shall...Consistency Analysis Consistency Determination The...

Last Modified: 01/07/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet