Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"
Include projected climate change impacts of slope stability changes after wildfires...and develop mitigation strategies for areas deemed at risk to...
Last Modified: 08/28/2024
Unlike the first two bays, the main bay has a slightly sloped gable roof and an...The main bay’s low-sloped gable roof features exposed wood...
Last Modified: 11/29/2021
SUBJECT TO INUNDATION BY 1% ANNUAL-CHANCE SHALLOW FLOODING (USUALLY SHEET FLOW ON SLOPING
Last Modified: 11/23/2021
8,000,000 24910 Landfill Organics Cover PW 376,455 376,455 24928 Landfill Slide Slope
Last Modified: 05/22/2025
$7,252,450 $3,870,500 $31,764,687 REFUSE COLLECTION AND DISPOSAL 24928 LANDFILL SLOPE
Last Modified: 05/24/2024
Open space areas must have a slope no greater than five percent, but may be located...All open space areas are flat and have a slope of 5...
Last Modified: 08/27/2021
Consistent; Driveway Slopes (Section 10-1-1604) The slope of a driveway or...The applicant has not provided the driveway ...
Last Modified: 10/02/2023
982.00 980.00 978.00 956.00 954.00 952.00 962.00 958.00 962.00 Average Slope...AVG Slope 42.78% 4.53% 24.51% 38.84% 52.04% 72.35% ...
Last Modified: 03/04/2025
Showing 401 to 408 of 606 entries.