Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"
under the bus shelter area; • Accessible slopes and cross slopes; • Minimum headroom...HILLSIDE, CURVED, AND SLOPED...
Last Modified: 03/24/2021
Required Less than Significant Impacts Impact WF-2: Would the project due to slope...EXISTING TRANSFORMER AREA ON THE EAST SIDE OF THE EXISTING BUILDING, GRASSY...
Last Modified: 10/14/2026
• Slope less than 5% • Not including front or street-side yards.
Last Modified: 09/15/2025
BASECOAT SLOPE TO DRAIN (1/8" MIN) SEE X/ADXX V = 6" MIN. @ PATIOS EXTEND WATERPROOFING
Last Modified: 09/28/2026
WALKWAY 2% SLOPE NOTE: NO CROSS VENTILATION BETWEEN RESIDENTIAL AND NO-RESIDENTIAL...FINISH FLOOR PLATE LINE FINISH FLOOR PLATE LINE FINISH FLOOR 10% STREET 2%...
Last Modified: 09/25/2025
Their territory also included east Piru Creek and the southern slopes of Sawmill...,” due to their settlement on south-facing mountain slopes.77...
Last Modified: 03/31/2021
Continuing projects include the Landfill Liner Construction, Landfill Slope Liner...4,000,000 8,000,000 C-2 Landfill Organics Cover PW 376,455 376,455 C-3 Landfill...
Last Modified: 09/11/2025
.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...
Last Modified: 01/19/2021
Showing 465 to 472 of 606 entries.