Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"
adjacent soils, traffic loading, and temporary equipment used to excavate the slopes...followed by a vapor collection layer consisting of a minimum of 4-inch aggregate or...
Last Modified: 05/04/2021
followed by a vapor collection layer consisting of a minimum of 4-inch aggregate or geocomposite
Last Modified: 03/31/2021
The area is mostly flat with a slight downward slope to the south.
Last Modified: 11/29/2021
Last Modified: 04/12/2021
Final slopes may be subject to verification and approval by the City Engineer or...Applicant must provide cross slope to determine if this is...
Last Modified: 07/17/2026
$9,800.00Valuation: REMOVE & REPLACE SHINGLES ON MAIN HOUSE WITH CLASS COMP SHINGLES, 1200 SF SLOPED
Last Modified: 05/28/2026
OLIVE AVE Commercial Repair and Maintenance $77,000.00Valuation: REROOF - AT LOW SLOPE
Last Modified: 06/15/2026
Slopes range from 0 to 5 percent....Slopes range from 0 to 5 percent....Provide adequate drainage and slope the ground...
Last Modified: 12/13/2024
Showing 553 to 560 of 606 entries.