Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali.
Search Results

2025 JUL FINALED

07/01/2025Permit Final Final Date:Permit Status: INSTALL NEW INTERIOR PARTITION WALL...EXCEPT FOR (1) WALL AT GARAGE; 1338 SF ADDITION, 252 SF...

Last Modified: 08/11/2025

Attachment 5 - Ordinance Extension_No._22-3975.pdf

Unit (6) Minimum Building Separation Between Primary Units Exterior Wall...to Exterior Wall 6-feet Eave to Eave 4-feet Minimum...

Last Modified: 03/02/2023

Attachment 6 - August 28, 2023, Planning Commission Staff Report without Attachments.pdf

ADU development standards: • ADU square footage is measured from exterior wall...to exterior wall, unless the ADU shares a...

Last Modified: 10/05/2023

20211015-Debt-Mgmt-Policy-062717.pdf

third-party trustee, the Finance Director or for BWP issuances its General Manager shall retain

Last Modified: 10/15/2021

Urban Lot Split Tentative Map Application_11082024

other identifying feature including a notation on each building or structure to be retained

Last Modified: 11/13/2024

Att2b - Resolution - Sequencing of Elections

District Elections in accordance with Elections Code § 10010 and authorized staff to retain

Last Modified: 06/18/2026

Fire Suppression System Discharges.pdf

Discharger is to retain records for a period of no less than five years.

Last Modified: 04/13/2021

2021_Pickwick_Arch_and_Site_Plan.pdf

Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) Decorative Shutters with...Panel Stucco Arch Low Tile Wall w/ Tile Cap (Barranca) ...

Last Modified: 11/23/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet