Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"
The Project site is currently zoned C-3 (Commercial General Business), which will retain...The existing land use category of Regional Commercial will also be ...
Last Modified: 11/04/2021
are determined to be potential tribal cultural resources, the Applicant shall retain...75 and the noise source reduces the noise level by about 5 dBA, while a solid...
Last Modified: 03/09/2022
Rooms (1.0%) * Numbers are approximate and exclude exterior, demising & corridor walls...the area occupied by the following permanent construction: exterior and interior...
Last Modified: 06/28/2021
Peak flows will be reduced as more runoffs will be retained on-site....treatment control BMPs must be sufficiently designed and constructed to treat or...
Last Modified: 12/13/2024
Last Modified: 08/20/2026
Demolition of existing walls will be required to reorganize the space to properly...The wall and stair repairs are necessary to correct structural...
Last Modified: 05/02/2024
Permit ☐ Development Review ☐ Minor Setback Exception ☐ SB-35 Streamlined Review ∗ ☐ Wall
Last Modified: 01/29/2026
RELOCATION OF AN INTERIOR, NONLOAD BEARING WALL, AND REARANGEMENT OF THE KITCHEN
Last Modified: 09/01/2026
Showing 1,361 to 1,368 of 1,593 entries.