Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali.
Search Results

Attachment 3 (3).pdf

CONSTRUCT 24"x24" CATCH BASIN CONSTRUCT UNDERGROUND STORMWATER CISTERN (FOR LID RETAINED...MASONRY WALL....A six (6) foot high decorative masonry...

Last Modified: 10/20/2022

Attachment 3 (4).pdf

CONSTRUCT 24"x24" CATCH BASIN CONSTRUCT UNDERGROUND STORMWATER CISTERN (FOR LID RETAINED...MASONRY WALL....A six (6) foot high decorative masonry...

Last Modified: 10/20/2022

Attachment 3..pdf

CONSTRUCT 24"x24" CATCH BASIN CONSTRUCT UNDERGROUND STORMWATER CISTERN (FOR LID RETAINED...MASONRY WALL....A six (6) foot high decorative masonry...

Last Modified: 10/27/2022

719 Wilson Ct - Approval Letter - FINAL

, not the square footage of walls)....walls = Demolition Percentage....Length of walls are to include interior and...

Last Modified: 02/15/2024

Permit Fees.pdf

$33.00 (APPLIED TO ALL SUBMISSIONS) **NO TAPING, STAPLING, OR HANGING ITEMS ON THE WALLS...$33.00 (APPLIED TO ALL SUBMISSIONS) **NO TAPING, STAPLING, OR HANGING ITEMS...

Last Modified: 07/24/2026

2710 Winona Ave - PROJECT PLANS -1.21.26

OF 1 PER SECTOR, 3 TOTAL) (E) BUILDING PARAPET WALL (E) BUILDING PARAPET WALL...ALL EXTERIOR WALL PENETRATIONS SHALL BE...

Last Modified: 02/17/2026

COMMERCIAL APPLICATION

ASSISTED LIVING (R-2, R- 4) INSTITUTIONAL (I) RELIGIOUS/INSTITUTIONAL (A-3) WALL...PARKING STRUCTURE: Off RELIGIOUS: Off RESTAURANT: Off RETAIL: Off STUDIO: Off ...

Last Modified: 03/26/2026

El Niño

Last Modified: 09/15/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet