Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"
analysis; determine compliance and non- compliance with applicable building codes and ASTM
Last Modified: 06/24/2026
Public Notice Proposed cut and fill work of a sloped grade portion in the rear...The Project involves a proposed cut and fill work of a sloped...
Last Modified: 04/13/2021
) 4 4 3/4" Bathtub Fill Valve 10 10 Shower, per head 2 2 Clothes washer 4...: Bathtub or Combination BathShower fill1: 34 Bathtub Fill...
Last Modified: 11/15/2024
Last Modified: 12/22/2023
(One copy required) Grading Bond (>250 CY total cut and fill in the hill area,...>500 CY total cut and fill in other areas.)...Limits and...
Last Modified: 05/28/2026
C1.30 CUT & FILL PLAN C1.31 GRADING SECTIONS C1.40 DRAINAGE PLAN CIVIL CLIENT:...ASTM C150, Type I or II....Wire for reinforcement shall...
Last Modified: 12/21/2023
(Total cut and fill) Provide a copy of soils and/or geology reports) for review...fill in other areas.)...Limits and quantities (in cubic yards)...
Last Modified: 02/09/2026
_______________ Accessory Structure(s), if applicable: ______________ Cut/Fill...• Preliminary grading plan if proposed, showing all cut and...
Last Modified: 05/18/2021
Showing 113 to 120 of 1,210 entries.