Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"
13,500 square feet of building area, greater than 5,000 cubic yards of soil cut/fill...applicant will retain a qualified environmental professional (EP), as defined by...
Last Modified: 09/16/2022
B G001 GENERAL INFORMATION SHEET • THIS SHEET IS TO BE FILLED OUT FOR PERMIT APPLICATION
Last Modified: 11/19/2024
Assistance If your business has open positions and is looking for candidates to fill
Last Modified: 03/18/2021
Water-filled barriers and pedestrian barriers will be placed for safety.
Last Modified: 09/11/2026
AND (SRI) OF 29 OR HIGHER WHICH ARE QUALIFIED USBBS LEED UL CERTIFIED TO MEET ASTM...D3462 AND ASTM D3018.
Last Modified: 03/04/2025
LAYER OF MINIMUM 72LB MINERAL SURFACED NONPERFORATED CAP SHEET COMPLYING WITH ASTM...LAYER OF MINIMUM 72LB MINERAL SURFACED NON-PERFORATED CAP SHEET COMPLYING WITH...
Last Modified: 06/30/2025
Additional site work includes 56.3 cubic yards of cut activity and 37.5 cubic yards of fill...Additionally, there will also be 37.5 cubic yards of...
Last Modified: 09/22/2026
The waiver must be filled out completely and signed by the League Director before...A player desiring a release from her team must have a waiver form...
Last Modified: 03/29/2022
Showing 457 to 464 of 1,210 entries.