Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah.
Search Results

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 12/12/2025

20250625 (3).fy25_26feescheduleadopted.pdf

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 03/18/2026

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 03/17/2026

20260630-FY-26-27-Adopted-Fee-Schedule

administration fee, plus the permit fee based on the total cubic yards of both cut and fill

Last Modified: 06/29/2026

20230504-FY-2023-24-Proposed-Budget-Final.pdf

11.550 12.500 13.000 0.500 * The Communications Manager position was previously filled...Conduct recruting to fill vacancies from retirements. 11...

Last Modified: 05/04/2023

Con Plan -IDIS FINAL.pdf

Entry-level roles are filled by workers with high school or associate degrees,

Last Modified: 09/15/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet