Showing results for "dWA 0821 1305 0400 Biaya Hidroseeding Land Scaping Hijau Sumbawa Barat Nusa Tenggara Barat"
Last Modified: 12/09/2025
DEPARTMENT OF PUBLIC WORKS REGARDING THE STATUS OF ANY TITLE ISSUES RELATING TO THE LAND...CODE OF REGULATIONS (AB 1881) MUST BE SUBMITTED TO THE DEPARTMENT OF PUBLIC...
Last Modified: 02/07/2025
Last Modified: 03/04/2025
The onsite private storm drain infrastructure was mapped using an ALTA/ACSM Land...The Hydrology Manual calls for an imperviousness of 91% for all parking lot...
Last Modified: 12/13/2024
Burbank sold his property to the Providencia Land and Water Company, which laid...The west was developed with a vacant land and a large paved...
Last Modified: 07/09/2021
Land Use and Zoning of the Adopted Citywide Fee Schedule, which have been deposited...This tax is imposed on real property (land and permanently ...
Last Modified: 09/11/2023
PLANTING EASEMENT: That portion of land made available as a public easement for the
Last Modified: 02/02/2023
(E) FINISH FLOOR HEIGHT TO REMAIN DOOR THRESHOLD8 8 8 8 (E) LANDING EXISTING
Last Modified: 12/22/2021
Showing 1,025 to 1,032 of 1,401 entries.