Search Results

Showing results for "dWA 0821 1305 0400 Harga Hydroseeding Land Scaping Hijau Palembang Sumatera Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Hydroseeding Land Scaping Hijau Palembang Sumatera Selatan.
Search Results

Planning_2021_STANDARD PLAN FORMATTING 2022 final.pdf

(standard, ADA- accessible, bicycle, etc.) based on the standards for different land

Last Modified: 01/26/2022

Public Works

Last Modified: 06/08/2026

2025 APR ISSUED

Remove (e) land & stair at side door, w/new concrete landing, steps & walk to connect...2025 Repair & Maintenance Issued Date:Permit...

Last Modified: 05/01/2025

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

(CRC R308.4.6) GLAZING ADJACENT TO THE STAIRWAY BOTTOM LANDING WHERE THE GLAZING...IS LESS THAN 36" ABOVE THE LANDING AND WITHIN 60" HORIZONTAL...

Last Modified: 03/11/2026

Appendix A - Air Quality Technical Report.pdf

Land Use Types 1.3....User Changes to Default Data Screen Justification Land Use Land Uses...

Last Modified: 01/07/2025

ApxK_Transportation Study.pdf

Pedestrian connections provide access from land uses to transit connections....0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561...

Last Modified: 07/09/2021

Final Submission

46 '-1 1" 8'- 0" 8'- 10 " 13 '-0 " 13 '-0 " 4'- 0" LA ND IN G 4'-0" LANDING...MATCH EXT'G SFD NEW WINDOW (SEE SCHEDULE) NEW DOOR (SEE SCHEDULE) NEW CONCRETE...

Last Modified: 06/16/2025

Final Submission - 4.10.25

46 '-1 1" 8'- 0" 8'- 10 " 13 '-0 " 13 '-0 " 4'- 0" LA ND IN G 4'-0" LANDING...MATCH EXT'G SFD NEW WINDOW (SEE SCHEDULE) NEW DOOR (SEE SCHEDULE) NEW CONCRETE...

Last Modified: 07/15/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet