Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"
because the activity is covered by the general rule that CEQA applies only to projects
Last Modified: 09/22/2022
Section 8 Projects (The “Unit” is affordable) 24 CFR Part 983 Section 8 Vouchers
Last Modified: 10/18/2023
, (i.e. high level review of scope, schedule, cost, and risk of infrastructure projects
Last Modified: 06/15/2023
Project was originally permitted & completed in 2020, but Walmart recently uninstalled
Last Modified: 09/02/2025
indirect physical change to the environment and falls outside the definition of a “project
Last Modified: 11/06/2025
Cumplir con la Política de Green Street existente de la Ciudad 9B....Consulte el Manual de Burbank Green Streets para obtener más información...
Last Modified: 02/08/2021
Last Modified: 10/30/2025
Showing 3,081 to 3,088 of 3,461 entries.