Showing results for "dWA 0821 1305 0400 Layanan Hydroseeding Green Project Tolikara Papua"
BUILDING ADDRESS: PROJECT TYPE: VALUATION: OCCUPANCY: USE OF STRUCTURE: TYPE OF...Shelton Street - [email protected] Submit, via email, attached...
Last Modified: 05/28/2026
+ Urbane Café Equinox + Ghost Sando Mendocino Farms Chik-fil-A Shop Sweat Green...Mixed-use project consisting of three six-story...
Last Modified: 09/04/2026
This sustainable garden would provide recreational green space, help keep the air...from the biological breakdown of organic matter materials such as manure, sewage,...
Last Modified: 01/07/2021
Green Building Council and the Business Council on Climate Change (BC3)....such as the Project....in the Project area.
Last Modified: 01/07/2025
The Project complies with the dedication, as shown on the Project plans....Electrical Code, California Mechanical Code, California Plumbing Code,...
Last Modified: 10/02/2023
pail to transport and empty the collected food and food-soiled paper into the green
Last Modified: 09/19/2022
Last Modified: 09/26/2022
Alteration $16,000.00Valuation: NONSTRUCTURAL REMODEL OF (2) BATHROOMS HOME PRO GREEN...2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 ...
Last Modified: 02/06/2026
Showing 905 to 912 of 3,619 entries.