Search Results

Showing results for "dWA 0821 1305 0400 Layanan Hydroseeding Green Project Tolikara Papua"

No results were found that matched the keywords: dWA 0821 1305 0400 Layanan Hydroseeding Green Project Tolikara Papua.
Search Results

20210101_Planning_Supplemental_TTM.pdf

implementation and after project development) at an interval of 5 feet and the...and net project density, street area, the lot area of each...

Last Modified: 03/29/2021

Castleman- 25.09.24

CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN): 1....CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS PROGRAM OR ii....ELECTRICAL CODE (CEC) ....

Last Modified: 04/21/2026

Att1 – Staff Report for Resolution of Intention from September 9, 2025

Team, supported through funding received from the TBID, manages the programs and projects...date, the TBID has unveiled three Superhero statues: Batman, Wonder Woman, and...

Last Modified: 10/02/2025

3915 Heffron Drive - Revised Plans - 6.30.26

GREEN NOTES: NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE MAXIMUM ALLOWABLE...BD. 2x6 PLUM WALL W/ GREEN B.D....BD. 2x6 PLUM WALL W/...

Last Modified: 09/04/2026

SUNSET CYN DR - Project Plans - 09-29-23

., B U R B A N K , C A . 9 15 01 PROJECT DESCRIPTION ADDRESS : 526...PROJECT DATE : YEAR 2020 TOTAL AREA OF EACH OCCUP. CL. /...

Last Modified: 01/23/2024

Curbs and Signage

Last Modified: 05/18/2026

Urban Lot Split Tentative Map Application_11082024

Project No....map colored as follows: cut areas - brown, fill areas-yellow, natural terrain - green

Last Modified: 11/13/2024

2025 CALGreen Residential Mandatory Measures

FOLLOWING NOTES SHALL BE REPRODUCED ON THE SITE PLAN OR COVER SHEET CALIFORNIA GREEN...CALGREEN) – INCORPORATE THESE MANDATORY ITEMS IN THE DESIGN AND CONSTRUCTION OF THE ...

Last Modified: 02/09/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet