Showing results for "dWA 0821 1305 0400 Vendor Jasa Hidroseeding Land Scaping Hijau Kediri Jawa Timur"
(standard, ADA-accessible, bicycle, etc.) based on the standards for different land
Last Modified: 03/29/2021
(standard, ADA- accessible, bicycle, etc.) based on the standards for different land
Last Modified: 01/26/2022
Last Modified: 06/08/2026
(CRC R308.4.6) GLAZING ADJACENT TO THE STAIRWAY BOTTOM LANDING WHERE THE GLAZING...IS LESS THAN 36" ABOVE THE LANDING AND WITHIN 60" HORIZONTAL...
Last Modified: 03/11/2026
Remove (e) land & stair at side door, w/new concrete landing, steps & walk to connect...2025 Repair & Maintenance Issued Date:Permit...
Last Modified: 05/01/2025
during construction by contractor, any shop drawings, or any material delivered by vendors...AutoCAD SHX Text SCOPE OF WORK: AutoCAD SHX Text PROJECT DATA AutoCAD SHX...
Last Modified: 06/12/2024
46 '-1 1" 8'- 0" 8'- 10 " 13 '-0 " 13 '-0 " 4'- 0" LA ND IN G 4'-0" LANDING...MATCH EXT'G SFD NEW WINDOW (SEE SCHEDULE) NEW DOOR (SEE SCHEDULE) NEW CONCRETE...
Last Modified: 06/16/2025
Last Modified: 07/15/2025
Showing 1,097 to 1,104 of 1,722 entries.