Showing results for "dWA 0821 1305 0400 Vendor Jasa Hidroseeding Land Scaping Hijau Kediri Jawa Timur"
► Program AQCC-9: Preference for City Contractors and Vendors Using Reduced-Emission...Give preference to qualified contractors and vendors using...
Last Modified: 12/02/2021
Last Modified: 07/29/2021
Explore how to pay or dispute a parking citation issued by the Burbank Police Department.
Last Modified: 04/21/2026
SHALL APPLY TO ALL CONSTRUCTION PROJECTS AND SHALL BE REQUIRED FROM THE TIME OF LAND...THE VENDOR OR FACILITY THAT THE APPLICANT PROPOSES TO USE TO...
Last Modified: 08/20/2025
combustion engines used by construction equipment and hauling trucks (dump trucks), vendor...per day associated with delivery of construction materials, the export of...
Last Modified: 05/04/2021
Compliance with Land Use Element Goal 3, Policy 3.2 of Burbank2035 General Plan:...uses in the neighborhood, consistent with Land Use Element Goal...
A RESOLUTION OF THE COUNCIL OF THE CITY OF BURBANK AMENDING THE GENERAL PLAN LAND...USE MAP TO ESTABLISH LAND USE DESIGNATIONS OF LOW DENSITY...
Last Modified: 04/09/2026
DOOR DOES NOT SWING OVER THE LANDING AND 1.5 INCHES WHEN DOOR SWINGS ONTO THE LANDING..., LANDINGS, AND RAMPS WITHIN...
Last Modified: 06/30/2025
Showing 225 to 232 of 1,719 entries.