Showing results for "dWA 0852 2611 9277 [[GLORION]] Pemborong Pembuatan Kitchen Set Granit Abu Abu Custom Bogor"
SCOPE OF WORK BACKYARD REMODEL, NEW COVERED OUTDOOR KITCHEN (410 SF), NEW POOL (...249 1239.24 FL 248 1239.78 TX 246 1239.58 AC 217 1242.07 FH 31240.70 ...
Last Modified: 06/02/2026
throughout, new energy star appliances, ceramic tile or natural linoleum in all kitchens...Additionally, low flow plumbing fixtures will be installed in all...
Last Modified: 05/02/2023
for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor kitchen...for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor...
Last Modified: 12/14/2023
PLUMBING FIXTURES (Please Indicate the Quantity) WATER CLOSET /TOILET/URINAL KITCHEN...DRAINAGE PIPING: VACUUM BREAKER: WATER CLOSET: BATHTUB SHOWER: LAUNDRY: ...
Last Modified: 11/19/2026
Thornton 1 1 Low RDA Set-Aside Perpetuity 2331 N....Fairview 7 1 VL, 6 Low HOME, RDA Set-Aside Perpetuity 2321 N....The new facility...
Last Modified: 04/15/2021
including the installation of a 10-foot-wide equestrian trail with decomposed granite
Last Modified: 10/20/2022
see separate handout for Checklist) Photos of Project Site – Provide one (1) set...of folded project plans: Off 2 reduced size 11x17 sets of...
Last Modified: 03/29/2021
Showing 785 to 792 of 2,792 entries.