Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat.
Search Results

SR - 921-1001 W. Riverside Dr V7.pdf

and/or upper-level decks for each unit (dwelling units are contained within a total...are arranged around a series of landscaped paseos and open spaces); • Of the...

Last Modified: 10/20/2022

2026 MAY FINALED

20 FT X 10FT MAX HEIGHT TENTS AND (8) 16 FT X16 FTX 10 FT MAX HEIGHT TENTS: (8) TOTAL...STORY GARAGE/STORAGE BUILDING WITH (N) 283 SF ADDITION TO CONVERT TO (N) 695 SF...

Last Modified: 06/15/2026

3700 RD_Proposed Architectural Plans.pdf

UNITS 49 UNITS 49 UNITS TOTAL AFFORDABLE UNITS 11% VERY LOW 4 UNITS*...80,582 SF 80,582 SF GROSS BUILDING AREA - TOTAL 82,723 SF...

Last Modified: 03/04/2022

Updated_Project_Plans.pdf

TOTAL BUILDING AREA MINUS PARKING => ±50,543.3 SQ.FT....TOTAL BUILDING AREA PLUS PARKING => ±70,513.8 SQ.FT. 910 S....LANDSCAPE =...

Last Modified: 10/29/2024

BPOA.pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 01/20/2021

BPOA MOU (2024-2027) - Final, signed.pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 12/02/2024

Soils Report.pdf (1)

Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of Liq.Sus. -200 Est....Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of...

Last Modified: 06/23/2023

Soils Report.pdf

Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of Liq.Sus. -200 Est....Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of...

Last Modified: 02/08/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet