Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"
JOISTS ON CENTER NUMBER SIMILAR REQUIRED MINIMUM SQUARE GALVANIZED FOOT, FEET GYPSUM...DRAWING NUMBER DRAWN ON B CONSTRUCTION TYPE: OCCUPANCY TYPE: ZONING: C-2 ...
Last Modified: 11/23/2022
38'-0" 638 36'-0" TOTAL...TOTAL LOT COVERAGE 50% OF LOT AREA=4473 S.F. (N) SFD FOOTPRINT 2307 S.F....- GALVANIZED...
Last Modified: 04/13/2021
• Welcomed Hilton Garden Inn, bringing Burbank’s hotel total to 17....• Produced Elephant Parade 2024 public art campaign, generating 439K...
Last Modified: 11/06/2025
TOTAL 14,481 SQ. FT....AMOUNT TO BE DETERMINED BY MEASUREMENTS. - ADD AGRICULTURAL GYPSUM....TOTAL 14,481 SQ. FT.
Interior finish material of 5/8” Type ‘X’ gypsum board is required. c.
Last Modified: 09/03/2025
GYPSUM BOARD H.B. HOSE BIB H.C. HOLLOW CORE HDR. HEADER H.M........................................ 2,495.0 (N) 8'-0" (E) 26'-9" (N) 14'-6" TOTAL
Last Modified: 02/07/2025
Last Modified: 03/03/2025
Last Modified: 07/28/2025
Showing 65 to 72 of 2,361 entries.