Search Results

Showing results for "dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo"

No results were found that matched the keywords: dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo.
Search Results

Downtown Burbank Sidewalk Enhancement Project Walking Tour #1

The City of Burbank is launching the planning process for the Downtown Burbank Sidewalk Enhancement Project and will host two community walking tours on Thursday, April 2, 2026, and Saturday, April...

Last Modified: 03/18/2026

11/16/21 - PH - Attachment 5

Interior finishes will favor formaldehyde- free finishes, low-allergen materials,...access from side  Individual access from front  Individual access from side or...

Last Modified: 11/04/2021

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 12/12/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 09/05/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 09/17/2025

20211229-FY-21-22-Fee-Schedule-Final.pdf

Park Facility Development Fee $152.00 Bedroom as Defined by BMC After 11/1/86...to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each ...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Contractual Services Cost** Application (B) Park Facility Development Fee $152.00 Bedroom...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a)...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Park Facility Development Fee $152.00 Bedroom as Defined by BMC After 11/1/86...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close...

Last Modified: 06/20/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet