Showing results for "dWA 0859 3970 0884 RAB Pasangan Interior Rumah Mewah Eropa Pleret Bantul"
Each (13) Manufactured House $155.05 Each Unit (14) Partition (a) Commercial, Interior...to 30 lf (ii) Additional partition, up to 30 lf $15.65 Each (b) Residential,...
Last Modified: 06/20/2022
Each (13) Manufactured House $162.25 Each Unit (14) Partition (a) Commercial, Interior...of Occupancy/Condo Conversion $80.80 Each Unit (5) Close Existing Openings (a)...
Last Modified: 03/09/2023
AREA: COVERED AREA: LOT COVERAGE: FLOOR AREA RATIO (FAR): SETBACKS: FRONT REAR INTERIOR
Last Modified: 07/14/2023
improvements, Olive Recreation Center, Burbank Little Theater renovations, and minor interior
Last Modified: 12/02/2024
INTERIOR SIDE YARD SETBACK: 5' MIN. 5' MIN.
Last Modified: 11/23/2021
HDWD HDWR HORIZ HR HT HVAC HW INSIDE DIAMETER INCLUDE, INCLUDING INSULTATION INTERIOR...LINES LINE TYPESCEILING/EQUIPMENT HEIGHTS DIMENSION STRINGSINTERIOR...
Last Modified: 10/13/2022
upkeep, as well as general cleaning and maintenance in the facilities of such interior...to the provisions of this section, to make such repairs and improvements to the ...
Last Modified: 09/20/2023
more than two stories in height; • Non-structural or non-seismic storefronts, interior...required front or street side yard, but may be permitted within the required...
Last Modified: 01/17/2023
Showing 521 to 528 of 780 entries.