Showing results for "dWA 0859 3970 0884 Renovasi Kitchen Set Abu Abu Berkualitas Jatipuro Karanganyar"
Finding: Investment percentages at June 30, 2018 were within the limits set forth...Finding: Investment maturities at June 30, 2018 were within the limits...
Last Modified: 12/21/2020
(PS&E) ..............................................19 Final Submittal (Bid Set...The BA shall include a description of the environmental...
Last Modified: 01/13/2021
Last Modified: 12/08/2020
Tenant Improvement $109,038.00Valuation: TI - Architectural - Fire Department kitchen...INFILL (E) WINDOWS IN BEDROOM & KITCHEN. 4. INFILL(E)...
Last Modified: 01/02/2026
PEYTON AVE Multi-Family Repair and Maintenance $16,500.00Valuation: TILE RE-SET...RELOCATE LAUNDRY TO KITCHEN. NEW 138.5 SF ATTACHED COVERED...
Last Modified: 09/02/2025
V2 = 0.2, and Broad-Scope retrofit set at Vu/V2 = 0.4 .....View Mode: Sets the view mode for the drafting area..../V2 = 0.2, and Broad-Scope...
Last Modified: 04/09/2024
REPLACE (1) KITCHEN SINK....REPLACE (1) KITCHEN SINK....REPLACE (10) ELECTRICAL FIXTURES, (20) ELECTRICAL OUTLETS, (1) EXISTING...
Last Modified: 10/01/2026
Result: Investment percentages at June 30, 2021 were within the limits set forth...Result: Investment maturities at June 30, 2021 were within the limits...
Last Modified: 12/09/2021
Showing 561 to 568 of 2,487 entries.