Search Results

Showing results for "dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga"

No results were found that matched the keywords: dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga.
Search Results

Fire Extinguishers

Fire extinguishers can be a life- and property-saving device. Learn how to use them properly.

Last Modified: 06/02/2026

BCEA MOU 2024 - 2026 FINAL.pdf

ASSIGNMENT - KITCHEN Employees who are primarily assigned to work in a kitchen...- SOCIAL SERVICES COORDINATORS IN THE HOME DELIVERED MEAL...

Last Modified: 06/24/2025

BCEA MOU 2024 - 2026 FINAL (1).pdf

ASSIGNMENT - KITCHEN Employees who are primarily assigned to work in a kitchen...- SOCIAL SERVICES COORDINATORS IN THE HOME DELIVERED MEAL...

Last Modified: 06/24/2025

19-107-PALM.pdf

ELEMENT, PER THE CITY'S BURBANK2035 GENERAL PLAN MOBILITY ELEMENT, THE CITY HAS SET...AutoCAD SHX Text KITCHEN AutoCAD SHX Text...

Last Modified: 11/27/2023

RESIDENTIAL APPLICATION

PLUMBING FIXTURES (Please Indicate the Quantity) WATER CLOSET /TOILET/URINAL KITCHEN...DRAINAGE PIPING: VACUUM BREAKER: WATER CLOSET: BATHTUB SHOWER: LAUNDRY: ...

Last Modified: 02/09/2026

Exhibit C REB II (Residency at Empire II - 3000 W Empire Ave., Burbank) Proposed Draft Unit & Rent Mix Jan 2023.pdf

throughout, new energy star appliances, ceramic tile or natural linoleum in all kitchens...Additionally, low flow plumbing fixtures will be installed in all...

Last Modified: 05/02/2023

Public Notice- 3344 Wedgewood Ln_11.29.23.pdf

for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor kitchen...for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor...

Last Modified: 12/14/2023

Public Notice- 3344 Wedgewood Ln_11.29.23 (1).pdf

for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor kitchen...for a future ADU, (2) two 4’ – 0” high retaining walls, and (3) a new outdoor...

Last Modified: 12/14/2023

2023.10.19 - BCEA MOU 2022 - 2024 - FINAL.pdf

ASSIGNMENT - KITCHEN Employees who are primarily assigned to work in a kitchen...- SOCIAL SERVICES COORDINATORS IN THE HOME DELIVERED MEAL...

Last Modified: 10/19/2023

20260630-FY-26-27-Adopted-Fee-Schedule

Without Kitchen $71.00 1-3 Hours With Kitchen $32.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/29/2026

20260814-FY-26-27-Adopted-Revised

Without Kitchen $71.00 $32.00 1-3 Hours With Kitchen Each Addl. Hr....1-3 Hours Without Kitchen Each...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

Without Kitchen $71.00 $32.00 1-3 Hours With Kitchen Each Addl. Hr....1-3 Hours Without Kitchen Each...

Last Modified: 09/22/2026

2026 JUL ISSUED

$4,700.00Valuation: INSTALLATION OF TWO NEW WALL MOUNTED ILLUMINATED SIGNS AND RELOCATE ONE SET...EXTENSIVE INTERIOR REMODEL; KITCHEN, DINING...

Last Modified: 08/10/2026

2025 APR ISSUED

Addition and Alteration $7,000.00Valuation: UNIT A- NON-STRUCTURAL REMODEL OF KITCHEN...FOR THE KITCHEN, REPLACE AND INSTALL NEW DISHWASHER, SINK...

Last Modified: 05/01/2025

Project Plans FINAL

SCOPE OF WORK BACKYARD REMODEL, NEW COVERED OUTDOOR KITCHEN (410 SF), NEW POOL (...249 1239.24 FL 248 1239.78 TX 246 1239.58 AC 217 1242.07 FH 31240.70 ...

Last Modified: 06/02/2026

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

CONTROL : THE FOLLOWING FINISH MATERIALS SHALL COMPLY WITH THE VOC CONTENT LIMITS SET...APPROVED SEWAGE DISPOSAL SYSTEM (R306.3) KITCHEN SINKS,...

Last Modified: 02/16/2024

2021_Planning_240 North Glenoaks Blvd - Public Notice.pdf

site sale and consumption of beer and wine at a sit-down restaurant (Ameci Pizza Kitchen...site sale and consumption of beer and wine at a sit-down restaurant (Ameci ...

Last Modified: 08/26/2021

2623 w magnolia-sc8_planning-0410.pdf

NOTED 03/01/2022 PLANNING 2111133 bar prep kitchen toilet seating sto wif...NOTED 03/01/2022 PLANNING 2111133 12/19/22- city comments ...

Last Modified: 04/24/2023

Appendix D - Historic Resource Assessment.pdf

J D Sterling Construction (C) $97,000.00 Kitchen remodel in all six units, new...Company (C) — Permit for six water closets, six lavatories, six bathtubs, six ...

Last Modified: 01/07/2025

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 06/20/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet