Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta.
Search Results

10.15.24 Staff Report.pdf

interviews were conducted the first week of October, with the process to continue until filled...The position is expected to be filled in early 2025.

Last Modified: 03/24/2025

1024 Bethany Rd - Mailing Notice - FINAL.pdf

As the project is built on an existing concrete pad, no fill, cut, or other grading...As the project is built on an existing concrete pad, no...

Last Modified: 09/22/2022

2022 WMP Residential Construction.pdf

= $310.55 = $0.00 = $ Fill out information below to determine required recycling...Fill in the blanks below to calculate your recycling rate: ...

Last Modified: 06/06/2023

2/8/22 - PH - Attachment 3

activity or from finished grade after grading, cut or fill activity, whichever...activity or finished grade after grading, cut, or fill...

Last Modified: 01/27/2022

Attachment 3 - Summary of Changes to Existing R-1 and R-1-H Standards.pdf

activity or from finished grade after grading, cut or fill activity, whichever...activity or finished grade after grading, cut, or fill...

Last Modified: 01/27/2022

2022 WMP Commercial Construction.pdf

= $310.55 = $0.00 = $ Fill out information below to determine required recycling...Fill in the blanks below to calculate your recycling rate: ...

Last Modified: 06/06/2023

Excavation-Requirements.pdf

Concrete areas cut and trenches receive 1 sack slurry fill, 8”-10” PCC, dowelling...following methods for compaction are accepted by Public Works: one sack slurry...

Last Modified: 07/20/2023

Redeem CRV on Bottles & Cans

Last Modified: 05/22/2026

118 Graham Place_PNOED FINAL.pdf

California Environmental Quality Act (CEQA) in accordance with Section 15332 (In-Fill...Section 15332 (In-Fill Development Projects): This...

Last Modified: 07/07/2022

118 Graham Place - Public Notice - Community Meeting.pdf

California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (In-fill...California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332...

Last Modified: 05/17/2022

257 West Linden Avenue - Mailed Notice.pdf

California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (In-Fill...California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332...

Last Modified: 11/21/2025

529-537 E Palm Ave - Public Notice - Community Meeting_final.docx

California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (In-fill...California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332...

Last Modified: 02/02/2023

529-537 E Palm Ave - Public Notice - Community Meeting_final.pdf

California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (In-fill...California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332...

Last Modified: 11/16/2023

1821 N Bel Aire Dr_HDP_Public Notice Letter_Final

single-family residence; (2) grading activity that includes 53 cubic yards of new fill...single-family residence; (2) grading activity that includes 53 cubic yards of...

Last Modified: 05/06/2026

20230829 Application COMMERCIAL BUILDING.pdf

GRADING/SHORING ASSEMBLY (A) OFFICE/LAB (B) NEW CONSTRUCTION TOTAL CUT & FILL...IMPROVEMENTS: Off LIABILITY INSURANCE: STUDIO PRODUCT: Off STUDIO SOUND: Off CUT...

Last Modified: 08/29/2023

Planning_2021_ 1719 N San Fernando _Public Notice.pdf

California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332 (In-Fill...California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15332...

Last Modified: 02/01/2022

2025 MAR ISSUED

AVE Demolition $5,000.00Valuation: BACKFILL OF EXISTING POOL WITH UNCERTIFIED FILL...Mary Bekerian 3108717070 91505CABurbank Owner 1305 N Pass...

Last Modified: 04/04/2025

2931 Olney Place Plans.pdf

FOR EXISTING POOL ON SITE, PROVIDE ANTI–ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 01/31/2022

Water Permit Approval Requirements for new ADU Ron T. Comments 7_15_20.pdf

Description Private Use Public Use SubTotal Bathtub or Combination Bath/Shower (fill...) 4 4 3/4" Bathtub Fill Valve 10 10 Shower, per head...

Last Modified: 03/25/2021

Water Permit Approval Requirements for new ADU.pdf

Description Private Use Public Use SubTotal Bathtub or Combination Bath/Shower (fill...) 4 4 3/4" Bathtub Fill Valve 10 10 Shower, per head...

Last Modified: 09/15/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet