Showing results for "dWA 0821 1305 0400 [[Adefa]] Vendor Polyester Geogrid Wilayah Kepahiang Bengkulu"
Staff will pursue sole source justification for selected vendor from May to July...A We're evaluating vendor was selected through a cooperative...
Last Modified: 03/03/2025
Solicit, review and evaluate vendor proposals Senior Mechanical Engineer (Contract...Nego ated with vendors to improve design for cost...
Last Modified: 06/24/2026
Geogrid fabric and segmental retaining walls do not require a separate retaining...Details and construction notes for all Geogrid walls must be on...
Last Modified: 12/08/2025
review and evaluation by clients, consultants, contractors, government agencies, vendors...review and evaluation by clients, consultants, contractors, government agencies,...
Last Modified: 11/27/2023
Worker and vendor deliveries vary by phase with a maximum of 80 worker vehicles...Vendor trips are based on CalEEMod default estimates based on...
Last Modified: 01/07/2025
review and evaluation by clients, consultants, contractors, government agencies, vendors...review and evaluation by clients, consultants, contractors, government ...
Last Modified: 05/03/2023
Established a contract with a vendor to upgrade the metering infrastructure so it...As of October, 2024 BWP is in the process of looking for alternative...
Last Modified: 11/12/2024
will be provided to each Council Member at no cost through the City’s insurance vendor
Last Modified: 09/02/2025
Last Modified: 04/29/2026
Labor Day weekend event features a massive arts and crafts fair with over 250 vendors
Last Modified: 06/18/2026
Last Modified: 01/20/2021
Vendor truck trips would occur in order to deliver building materials to the Project...Thus, vendor truck trips generally do not occur...
2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2504902 1305...STUCCO PATCHING ABOUT 1200 SF Mary Bekerian 3108717070 91505CABurbank Owner...
Last Modified: 07/07/2025
Lmax(dB) Lmin (dB) Peak (dB) 55.3 67.1 51.8 92.3 Equipment Category Type Vendor...Lmax(dB) Lmin (dB) Peak (dB) 66.5 83.4 57.1 99.5 Equipment Category Type...
Last Modified: 11/29/2021
Last Modified: 11/03/2026
Last Modified: 07/01/2026
IT SHALL BE SOLELY THE SIGN VENDORS RESPONSIBILITY TO DESIGN, FABRICATE AND INSTALL...ANY AND ALL STRUCTURAL CONSIDERATIONS SHALL BE COORDINATED BETWEEN THE SIGN ...
Last Modified: 03/25/2026
ALL EQUIPMENT WILL BE VENDOR SELECTED WITH APPROVAL....ALL EQUIPMENT WILL BE VENDOR SELECTED WITH APPROVAL....ALL EQUIPMENT WILL BE...
Last Modified: 03/18/2025
Showing 161 to 180 of 668 entries.