Search Results

Showing results for "dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten.
Search Results

Transparency

Explore the Burbank Police Department’s Transparency Portal for access to policies, training materials, and updates that reflect our commitment to accountability, public trust, and best practices in law enforcement.

Last Modified: 02/12/2026

20230710-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/10/2023

20230731-FY-23-24-Fee-Schedule-Final

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/01/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/10/2023

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 12/12/2024

FY 2024-25 Adopted Fee Schedule

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 06/27/2024

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/20/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 10/05/2023

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/04/2025

Attachment 7 – EIR Addendum.pdf

system to accommodate runoff volume and implementation of mitigation measures to control...same activities would decrease since the regulatory standards and technology ...

Last Modified: 01/18/2024

2025 OCT ISSUED

$90,000.00Valuation: UPDATES TO ELECTRICAL INFRASTRUCTURE TO SUPPORT VIRTUAL RAMP CONTROL...$5,000.00Valuation: USE EXISTING 120V CIRCUITS TO POWER (5) 500VA TRANSFORMERS...

Last Modified: 11/03/2025

ApxA3_AirportandRailwayHealthRiskAssessment.pdf

Typical train engines include a throttle control with eight positions, plus an idle

Last Modified: 07/09/2021

2/8/22 - PH - Attachment 2

with a minimum width of 15 feet, and not part of the shared driveway, and under control

Last Modified: 01/27/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet